Remove Agreement Remove BIM Remove Insurance Remove Risk
article thumbnail

Critical Issues and BIM – NIBS buildingSMART alliance conference – January 7-11, 2013

Building Information Management

Efficient construction delivery methods (IPD – integrated project delivery, JOC – job order contracting), cloud computing, and BIM are all integral components. Symposium Title: Integrating BIM: Moving the Industry Forward. Friday: BIM Academic Education Symposium. Day(s)/Date(s): January 7-11, 2013.

BIM 45
article thumbnail

Critical Issues and BIM – NIBS buildingSMART alliance conference – January 7-11, 2013

Building Information Management

Efficient construction delivery methods (IPD – integrated project delivery, JOC – job order contracting), cloud computing, and BIM are all integral components. Symposium Title: Integrating BIM: Moving the Industry Forward. Friday: BIM Academic Education Symposium. Day(s)/Date(s): January 7-11, 2013.

BIM 40
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Construction Risk Management: What to do when your project goes wrong

Lets Build

There is a number of parameters that you should think about and an efficient management of the risk is surely necessary. In other words, you can’t really define risk on the exact same way in every construction project. Even within the same project, there may be distinct sources of risk. Types of risk in construction.

Risk 165
article thumbnail

A glossary of terms with reference to Construction Cost Estimating

Construction Cost Estimating

These uncertainties are risks to the project. Some refer to these risks as "known-unknowns" because the estimator is aware of them, and based on past experience, can even estimate their probable costs. In VDC (BIM is one method) the modeling consists of the usual three dimensions, plus the time dimension and the cost dimension.

article thumbnail

Construction Disputes: What You Need To Know

Lets Build

Disputes over insurance agreements can be, for example, one of those reasons. One of the project parties may feel that it’s entitled to some compensation while the insurance company, or whoever is responsible for that may have a different opinion. Find also: The Future of Construction – BIM. Strike Action.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 52 00 Agreement Forms. 00 52 13 Agreement Form – Stipulated Sum (design/bid/build or. 00 52 16 Agreement Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 52 23 Agreement Form – Construction Manager as Agent or Advisor – Stipulated. 00 52 00 Agreement Forms. Requirements.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 52 00 Agreement Forms. 00 52 13 Agreement Form – Stipulated Sum (design/bid/build or. 00 52 16 Agreement Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 52 23 Agreement Form – Construction Manager as Agent or Advisor – Stipulated. 00 52 00 Agreement Forms. Requirements.