Remove Agreement Remove BIM Remove Modeling Remove Overhead
article thumbnail

How Much Does Rework Really Cost Your Job and What Can You Do to Stop It?

Construction Junkie

Unsatisfied with stopping at direct cost, the researches at Navigant then turned their attention to overhead costs, which include managerial, supervisor, and site safety costs. Pre-Construction Design Freeze After agreements are made, there must be a point in which no more changes can be made and the work can start without worry.

article thumbnail

Autodesk Construction Champions 2023: 25 People Powering the Future of Construction 

Autodesk Construction Cloud

Princeton University   Alec Overn Business Manager, Modular Power Solutions, Dallas, TX Alec joined MPS in 2019, and implements the organization’s objectives, policies, and performance standards as well as oversees overhead departmental functions. She sees data as the key to success, particularly in industrialized construction implementation.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

A glossary of terms with reference to Construction Cost Estimating

Construction Cost Estimating

See also Overhead, Indirect cost. See also, Overhead, General & Administrative Cost, Distributable. Overhead - In business, overhead or overhead expense refers to an ongoing expense of operating a business; it is also known as an "operating expense." in the execution of construction work activity.

article thumbnail

Job Order Contracting – 2015

Building Information Management

The coefficient must include not only the contractor’s overhead and profit, but also any adjustment that may be needed to the UPB prices based on the contractor’s costs in the local area of the contract(which are functions of labor costs, subcontractor base, market conditions and client-specific conditions). Key elements. Advantages.

article thumbnail

A Comparison of Construction Cost Estimating Software Tools 2015

Building Information Management

Furthermore, the collaborative aspects of these sophisticated software systems are aligned with integrated project delivery methods and construction sector movement toward Building Information Modeling (BIM). Construction estimating involves the estimating of material, labor, equipment, overhead, and contingencies.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 52 00 Agreement Forms. 00 52 13 Agreement Form – Stipulated Sum (design/bid/build or. 00 52 16 Agreement Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 52 23 Agreement Form – Construction Manager as Agent or Advisor – Stipulated. 00 52 00 Agreement Forms. Requirements.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 52 00 Agreement Forms. 00 52 13 Agreement Form – Stipulated Sum (design/bid/build or. 00 52 16 Agreement Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 52 23 Agreement Form – Construction Manager as Agent or Advisor – Stipulated. 00 52 00 Agreement Forms. Requirements.