Remove Agreement Remove Drawings Remove Overhead Remove Sustainability
article thumbnail

Army Job Order Contracts FAIL to meet AFARS requirements MOST OF THE TIME

Job Order Contracting

general and administrative and other overhead costs, insurance costs, bonding and alternative payment protection costs, protective clothing, 5117.9002 Applicability. (a) However, informal (shop) and as-built drawings, incidental to the job, reflecting the plan of action and the completed project, are anticipated under a JOC.

Contract 226
article thumbnail

Setting up a Job Order Contract Using Best Management Practices

Job Order Contracting

general and administrative and other overhead costs, insurance costs, bonding and alternative payment protection costs, protective clothing, equipment rental, sales tax and compliance with tax laws, and also contractor’s profit). “Job JOC is used to execute repair, sustainment, restoration, modernization, and minor new construction projects.

Contract 100
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Best Practice Job Order Contracting

Job Order Contracting

a) Job Order Contracting (JOC) is an alternative contracting method to fulfill requirements for sustainment, restoration, and modernization (SRM) projects at installation level (post, camp or station), with an estimated value exceeding $2000 , but not exceeding the amount of SRM authority delegated to the installation by the ACOM and/or HQDA.

Contract 100
article thumbnail

Autodesk Construction Champions 2023: 25 People Powering the Future of Construction 

Autodesk Construction Cloud

Additionally, the construction has made significant strides in sustainability and inclusivity, so professionals can contribute to a greener future while enjoying a more diverse work environment. As we know, construction teams go through a lot of paper—much of that is used to print drawings, mark up documents, and the like.

article thumbnail

Job Order Contracting – JOC – DOD – AFARS

Building Information Management

a) Job Order Contracting (JOC) is an alternative contracting method to fulfill requirements for sustainment, restoration, and modernization (SRM) projects at installation level (post, camp or station), with an estimated value exceeding $2000, but not exceeding the amount of SRM authority delegated to the installation by the ACOM and/or HQDA.

article thumbnail

Lean Construction – Overcoming decades of mistrust, lack of communication, and opposition between facilities owners, designers, engineers, and builders.

Job Order Contracting

Project cannot be expedited with a collaborative fast-track process; drawings and specs must be 100% complete to bid (though latter rarely occurs). Bid shopping can occur and actual overhead and profit amounts are unknown. Design changes can result in costly impacts to drawings or construction work in progress. Disadvantages.

Design 130
article thumbnail

Job Order Contract – Frequently Asked Questions

Job Order Contracting

facility or infrastructure (road, bridges, airports, mass transit, utility…) renovation, repair, sustainability, maintenance, and minor new construction projects. Should a UPB include overhead and profit? A UPB should reflect costs for a specific task without applying full overhead and profit. Is JOC Software required?

Contract 100