Remove Agreement Remove Materials Remove Overhead Remove Subcontracting
article thumbnail

Job Order Contract Execution Guide – Sample Template

Job Order Contracting

project task/line item, a full description in plain English, a unit of measure and a corresponding unit price, including labor, material, and equipment details, and an associated approved contractor coefficient are to be the basis for Contractor compensation. coefficient (reference table of allowable overhead). authorization.

Contract 100
article thumbnail

Job Order Contract – Frequently Asked Questions

Job Order Contracting

It is a listing of construction tasks, organized using MasterFormat, including a detailed line item description and unit pricing for labor, material, and equipment. It is critical, however, that the tasks and the prices reflect labor, material, and equipment specific to the area in which the JOC is located.

Contract 100
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

#98:  Good Faith Limits on Termination for Convenience

NH Construction Law

Such a provision was part of a commercial painting subcontract in Hate to Paint, LLC v. This clause was in the parties’ agreement: TERMINATION FOR CONVENIENCE: The General Contractor may terminate the Contract for convenience upon three (3) days prior written notice. Ambrose Development, LLC , No.

article thumbnail

Lean Construction – Overcoming decades of mistrust, lack of communication, and opposition between facilities owners, designers, engineers, and builders.

Job Order Contracting

Bid shopping can occur and actual overhead and profit amounts are unknown. High initial set up costs make DB suitable only for major new construction Not a fully collaborative multiparty agreement. Major pre-planning effort is needed to prepare sufficient material for the request for quotations (RFQ)/RFP process. Advantages.

Design 130
article thumbnail

#66:  Labor Inefficiency Costs: Who Pays? How Much?

NH Construction Law

Sometimes unanticipated compression is the result of acts of God or of third parties, in which case it is crucial to examine the contract or subcontract to see who has agreed to bear this risk. But a recent case suggests that such a lien may be granted if the owner has a cost-plus or “time and materials” arrangement.

Lien 40
article thumbnail

Job Order Contracting – Best Practices Implementation

Building Information Management

JOC, an annual contract and multiple option year agreement for general construction, generally requires the Contractor to e furnish associated labor, tools, materials, equipment and transportation. Contractors are generally selected as part of a multi-year agreement, and/or for one year with tw0(2) to four(4) option years.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 31 25 Existing Material Information. 00 31 26 Existing Hazardous Material Information. Material Testing Information. 00 52 00 Agreement Forms. 00 52 13 Agreement Form – Stipulated Sum (design/bid/build or. 00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. Requirements.