Remove Agreement Remove Office Remove Procurement Remove Sustainability
article thumbnail

Define Construction Procurement

Job Order Contracting

Define Construction Procurement. Define Construction Procurement… It’s easy to define construction procurement right? Improper construction procurement methods and a relative lack of competency on the part of procurement staff have greatly contributed to poor construction outcomes. Perhaps not.

article thumbnail

LEAN OpenJOC(TM) Job Order Contracting for Sustainable Facilities Repair, Renovation, and Minor New Construction

Job Order Contracting

Benefits of an OpenJOC Job Order Contract implementation include an expedited procurement process, and consistent completion of quality projects on-demand, on-time, and on-budget per owners/contractor expectations. Best value procurement. Owner technical and procurement staff is supplemented. The Origins of IDIQ and JOC.

Contract 100
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Army Job Order Contracts FAIL to meet AFARS requirements MOST OF THE TIME

Job Order Contracting

But that’s not all, the DoD doesn’t leverage current system thinking and robust, integrated planning, procurement, and project delivery workflows to maximize utilization of resource. However, contracting officers may exceed the 10 percent if justified and approved in accordance with FAR 6.302. 5117.9004-2 Solicitation. (a)

Contract 228
article thumbnail

ASBCA Says “Not So Fast” to Contractors Seeking Relief from Pandemic Impacts

Federal Construction Contracting Blog

The delivery order contained numerous fixed-price line items, some of which the contractor needed to procure from an outside vendor. Since the onset of the pandemic in 2020, the vendor’s prices for two of these line items had risen dramatically, and the contractor could not procure those items from another vendor.

article thumbnail

Best Practice Job Order Contracting

Job Order Contracting

County, State, and Local Governments, include secondary education unfortunately continue to use JOC simply as a means to speed delivery and bypass traditional procurement versus as a LEAN collaborative construction delivery method. a) JOC may be used to execute sustainment, restoration, and modernization projects at an installation.

Contract 100
article thumbnail

Digicon India: Enhancing the Workforce’s Capability Seen as Greatest Priority by Indian Construction Leaders

Autodesk Construction Cloud

This aligned with the theme of the conference to assist with adopting solutions required to connect the office and the field. However, methodologies require harmonisation across Indian design and building standards and applicability to guidelines for safer, sustainable and predictable methodologies for whole-of-life considerations in India.

article thumbnail

Job Order Contracting Operations Manual

Job Order Contracting

facilities inspection programs generate requirements for sustainment, restoration, modernization work and minor new construction. Completed Individual Job Orders (IJO), Task Order (TO), or Job Orders (JO) are submitted to the a designated office/person in accordance with regulations and standard procedures. Ordering Responsibilities.

Contract 100