Remove Airports Remove Documentation Remove Materials Remove Risk
article thumbnail

Building Hong Kong's Airport

The Constructor

The two former islands that were levelled comprise about 25% of the surface area of the airport’s 12.55 Land reclamation for the airport added nearly 1% to the entirety of Hong Kong’s surface area. kmĀ² platform. It is connected to the northern side of Lantau Island near Tung Chung new town.

Airports 203
article thumbnail

Credible Construction Estimate Core Elements

Job Order Contracting

Locally researched labor, material, equipment, and productivity data is essential in the devlopement of a credible construction cost estimate. GAO, 2009 The associated processes for developing a credible construction cost estimate are equally well documented. ENR economic index, etc.)

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

MATERIALS FOR FORMWORK

The Constructor

Mon, 1 Oct 2012 About Jobs Connect Groups Forums Toolbar SMS Alerts RSS Feed Search The Constructor Subscribe by E-Mail to receive latest updates. It is easily cut to shape on site, and if handled and stored carefully, it can be used many times. Note the different thickness: A standard plywood thickness on site is 18mm.

Materials 136
article thumbnail

Damage Control: 5 Ways to Manage Construction Mistakes

Autodesk Construction Cloud

Silver Line Metrorail project leading to the Dulles International Airport. Instead of the installed panels lasting for 100 years, water would be able to penetrate the concrete to deteriorate the materials at a faster rate. 2: Thoroughly Document Mistakes. If possible, make sure to document the mistake visually with photos.

article thumbnail

Subways in America

The Constructor

Mon, 1 Oct 2012 About Jobs Connect Groups Forums Toolbar SMS Alerts RSS Feed Search The Constructor Subscribe by E-Mail to receive latest updates. Advertisement Hot Topics Recent Topics Most Viewed Most Discussed FOUR PHASES OF PROJECT MANAGEMENT WHAT IS PROJECT MANAGEMENT?

America 203
article thumbnail

TEMPERATURE EFFECTS ON CONCRETE

The Constructor

Mon, 1 Oct 2012 About Jobs Connect Groups Forums Toolbar SMS Alerts RSS Feed Search The Constructor Subscribe by E-Mail to receive latest updates. The size of movement depends upon the change in temperature and the coefficient of thermal expansion o f concrete.

Concrete 194
article thumbnail

FOUR PHASES OF PROJECT MANAGEMENT

The Constructor

Team members monitor and control progress in terms of cost, time, and quality; and manage risk. Mon, 1 Oct 2012 About Jobs Connect Groups Forums Toolbar SMS Alerts RSS Feed Search The Constructor Subscribe by E-Mail to receive latest updates. Executing the project: In this phase of the project, team is ready to launch the project.