Credible Construction Estimate Core Elements

Job Order Contracting

A credible construction cost estimate is required prior to engaging in procurement. The follow elements are common to a credible construction cost estimate. Credible Cost Estimate Core Elements #1 Objectivity – The information used and those invovled in the creation of the construction cost estimate must be objective.

article thumbnail

Construction Cost Estimator – Line Item

Job Order Contracting

Construction Cost Estimator – Line Item. A superior line item construction cost estimator generally has an intricate knowledge of field construction techniques, uses a common data environment, and is skilled at both collaboration and LEAN construction and/or facilities management. Transportation (Airports/Mass Transit).

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Dispatch from Alaska: insights on moisture, soil, and material performance

Construction Specifier

The most recent study, conducted in 2019, built on previous findings from research done in Alaska and Canada, examines the use of insulation in roadway embankments and airport runways. In Alaska, permafrost is found below about 85 percent of the state, according to the National Resources Defense Council (NRDC). Reports estimate 6.4

Alaska 52
article thumbnail

Top Ten Construction Projects in World

Construction Cost Estimating

These projects not only take up huge ground area, but they are also gigantic in scope, manpower and resource usage, economic and geographical impact, and they take quite some time to build. Some of these require very different kinds of technologies to construct, as you will see below.

article thumbnail

Public Sector Real Property Management – Quality Construction Cost Estimating – Earned Value Management

Building Information Management

The Need for Credible Construction Cost Estimates. GAO and other studies/reports consistently report that errors and lack of due diligence with respect to original construction cost estimates are primary reasons for negative cost and schedule impacts, and overall poor project performance and outcomes.

article thumbnail

Subways in America

The Constructor

RECOMMENDED FOR YOU Building Hong Kong’s Airport Close All rights reserved.

America 203
article thumbnail

FOUR PHASES OF PROJECT MANAGEMENT

The Constructor

Organizing projects means defining roles and responsibilities, create a project charter, and develop high-level time and cost estimates. While doing planning for the project, effective and clear estimate of the time and costs are done. Organizing of the project is an important step towards planning of the project.