article thumbnail

Concrete materials management

GCP Applied Technologies

Concrete materials management. Below are some helpful articles for concrete producers to consider while managing their materials, from overcoming common quality obstacles to dealing with returned concrete. This fine powder byproduct of coal plants is often used to replace natural materials in the production of concrete.

article thumbnail

Building Hong Kong's Airport

The Constructor

The two former islands that were levelled comprise about 25% of the surface area of the airport’s 12.55 Land reclamation for the airport added nearly 1% to the entirety of Hong Kong’s surface area. kmĀ² platform. It is connected to the northern side of Lantau Island near Tung Chung new town.

Airports 203
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Achieving project success through product and material testing

Construction Specifier

The construction industry faces a myriad of challenges, such as completing projects on schedule, ensuring the quality and safety of products and materials, overseeing the costs so they do not exceed the budget, and complying with corporate environmental and social responsibility standards; all while applying effective risk management at every step.

article thumbnail

Underground Utilities- Inefficiencies and Damage ā€“ $100B Annually

Job Order Contracting

Failure to use locally researched detailed unit price repair, renovation, maintenance, and construction task data, inclusive of labor, material, equipment, and productivity. are not being managed properly. Put more simply, the direct costs and indirect costs of sending crews to repair damaged pipes, cables, pumps, switchgear, etc.

article thumbnail

FOUR PHASES OF PROJECT MANAGEMENT

The Constructor

There are four phases of project management which are required to manage projects efficiently on quality, time and costs. Defining and organizing the project: Defining project is the first step in the project management process.

article thumbnail

Damage Control: 5 Ways to Manage Construction Mistakes

Autodesk Construction Cloud

Silver Line Metrorail project leading to the Dulles International Airport. Instead of the installed panels lasting for 100 years, water would be able to penetrate the concrete to deteriorate the materials at a faster rate. Providing complete descriptions of the misstep can prevent it from materializing again with another project.

article thumbnail

ā€œOrbā€: a New Natural Building Material

Natural Building

Cocoa husks, dried orange peel, and ground blue pea flowers are among the ingredients that constitute a new class of building materials that could revolutionize construction. They are waste products that are used to make “Orb”, a sustainable building material that is carbon neutral. That was even more shocking,ā€ he says.