Remove Architecture Remove Change Orders Remove Engineering Remove Life Cycle
article thumbnail

Construction is NOT complex…. People are. Successful Construction Project Delivery Requirements

Job Order Contracting

Only improved early and ongoing collaboration and communication across all participants and stakeholders has proven to reduce errors and omissions, minimize the number of change orders, shorten overall project delivery times, improve quality, and reduce total project costs.

article thumbnail

Efficient Facilities Repair, Renovation, and Construction Basics

Job Order Contracting

As a result, staggering levels of economic and environmental waster are common across the architectural, engineering, construction, operations, and owner groups. There are currently at least three proven LEAN methods relevant to this discussion: Life-cycle total cost-of-ownership modeling and management. The Obstacles.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Collaboration in Construction – From “ad-hoc” to “best process”.

Job Order Contracting

Many commercial real property owners and facilities managers will require building competencies in all aspects of built environment life-cycle management. Change management implement, specifically shifting from ‘ad hoc’ methods to program and process-based workflows.

article thumbnail

Demand For Efficient Life-Cycle Building Management Processes – BIM, JOC, IPD – FIATECH PRESENTATION – 2012

Building Information Management

A thorough understanding and visualization of a project among Owners, Architects and Engineers, Contractors, and other shareholders defines scope, specifications, and is is the project delivery method that set the overall tone of interrelations ships among the project participants and shapes final outcomes.

article thumbnail

Integrated project delivery method

Job Order Contracting

These benefits are largely derived through the use of a common data environment, CDE, which dramatically improves communication and collaboration throughout the project life-cycle. A detailed, full transparent line item construction cost estimate is critical for improving collaboration and reducing change orders. .

article thumbnail

Improving Renovation, Repair, and Maintenance Project Delivery

Job Order Contracting

Educational and training programs must focus upon asset life-cycle management and modeling. Overall focus must shift from first-cost mentality to life-cycle/total-cost-of-ownership. Timely, accurate, repeatable, and verifiable information based upon standardized terms, definitions, and data architectures.

article thumbnail

Optimize Facility Renovation, Repair, and Construction Delivery with Robust Business Processes

Building Information Management

Real Property Owners, Contractors, Architects, and Engineers are under tremendous pressure to innovate, accelerate project delivery times, and minimize costs. They remain plagued by low productivity, a low-bid/change-order mentality, and adversarial relationships among all construction project participants.