Remove Architecture Remove Documentation Remove Fabrication Remove Visualization
article thumbnail

What’s the difference between RFIs, Submittals and Specifications?

Fieldwire

The construction RFI is a formal written process in which parties, such as the contractor and designer, clarify information gaps in construction documents. Specifications, often called specs, in construction documents usually include information about the project’s materials, the timeline, methods and requirements.

article thumbnail

Difference Between Sketching and Drawing | What Are Conceptual Sketches | Architecture Concept Drawing | Types of Drawings for Building Design

CivilJungle

Architecture Concept Drawing. An architecture concept drawing is a technical drawing of a building (or building project) that falls within the definition of architecture. Normally the largest paper size used in modern architectural practice is ISO A0 (841 mm × 1,189 mm or 33.1 Shop Drawing. Design Drawing. Floor plan.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

AEC Collection Workflows: Dynamo for Structure

BIM & Beam

The visual programming interface of Dynamo for Revit is enabling structural engineers with the tools to build structural models with minimal energy and make their own structural design tools. Basing on the architectural geometry they can retrieve a model data and create parametric based structural models to explore several design options.

article thumbnail

Expanding the exterior footprint

Construction Specifier

While cities occupy just three percent of global land area, by 2050 they will be home to two-thirds of the world’s inhabitants according to Gensler’s, 75 percent of the world’s population will live in cities, according to Gensler’s Aleksander Sasha Zeljic in a June 2018 interview with Architectural Products magazine.

article thumbnail

Rebar Projects in Revit

BIM & Beam

The visual capability of Revit, coupled with the ability to design reinforced concrete in 3D, allows users to gain more insight into the design during the project than would otherwise have been the case. Their use of Revit and SOFiSTiK on the Moorgate Shaft project is well documented.

Revit 40
article thumbnail

BIM Guide for Owners – Building Information Management, Model, Modeling

Building Information Management

The benefits include centralized and visual communication, early exploration of options, sustainability, efficient design, integration of disciplines, site control, as built documentation, etc.–effectively Citation – Some excepts and content from: Computer Integrated Construction Research Program.

article thumbnail

Top 30 Construction Classes at Autodesk University 2021

Autodesk Construction Cloud

Ivana shares how Mace saved 50% of their time spent on coordination and reporting by using BIM 360 Document Management and Model Coordination. How you approach the preconstruction phase—which involves ironing out your plans, designs, and documentation—can make or break the ease in which you move through a project.