Remove Architecture Remove Drawings Remove Fabrication Remove Transportation
article thumbnail

Difference Between Sketching and Drawing | What Are Conceptual Sketches | Architecture Concept Drawing | Types of Drawings for Building Design

CivilJungle

Concept drawing can also be used to explore more technical aspects of a design providing an initial response and possible solutions to problems, constraints and opportunities such as service layout, structure, method of construction, paths and shading, patterns and calculations, the relationship between aspects of size etc. Scale Drawing.

article thumbnail

Innovative Approaches to Industrial Construction Project Management

Construction Marketing

This has obviously led to large-scale improvements in the way structures are designed and building materials are fabricated. All stakeholders have access to the same files, documents, drawing, and models. Look at incorporating decorative screens and architectural grilles to create a more attractive facade for industrial structures.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Transforming shopping malls into 21st century neighborhoods

BD+C

Marc Asnis, AICP MFPRO+ Blog University Buildings Healthcare Facilities Mixed-Use Apartments Retail Centers Shopping Centers Designers Architects Adaptive Reuse Exterior Restoration Interior Architecture Sustainability Sustainable Development The death of the 20th century shopping mall is evident all across the country.

Austin 105
article thumbnail

Benefits and drawbacks of steel members

Construction Cost Estimating

Due to their small size, it becomes easier to deal with and transport steel members. The steel members are utilized as pre-fabricated members as they can be easily managed, fabricated and constructed. The steel members are utilized as pre-fabricated members as they can be easily managed, fabricated and constructed.

article thumbnail

Talent and Tech: The Keys to Unlocking Prefabrication Success 

Autodesk Construction Cloud

This isn't an easy lift; it's a complex orchestration that involves organizing and executing the transportation, storage, and handling of modular components. Allied BIM Allied BIM enables firms to assemble, spool, and fabricate remotely, saving teams time, money, and reducing material waste.

article thumbnail

FORMWORK AND GOOD FORMWORK PROPERTIES

The Constructor

Its importance is evident when you consider that the cost of fabrication, erecting and striking the formwork, often exceeds the cost of the concrete it is designed to shape and support. For anything other than most smallest of concreting jobs e.g. walls over 1m in height, a drawing should be provided, showing what formwork is required.

Concrete 223
article thumbnail

COMMON STRUCTURAL FAILURE CAUSES

The Constructor

2) poor communication between the fabricators and erectors. (3) 8) inadequate preparation and review of contract and shop drawings. (9) 3) Bad workmanship, which is often the result of failure to communicate the design decisions to the persons, involved in executing them. (4) 9) poor training of field inspectors. (10)

Concrete 177