Remove Bidding Remove BIM Remove Documentation Remove Overhead
article thumbnail

How Much Does Rework Really Cost Your Job and What Can You Do to Stop It?

Construction Junkie

Unsatisfied with stopping at direct cost, the researches at Navigant then turned their attention to overhead costs, which include managerial, supervisor, and site safety costs. Review of Constructability Hiring an independent contractor or consultant is recommended to review all construction documents prior to start of construction.

article thumbnail

4BT’s Best Value Job Order Contracting Solution

Job Order Contracting

For example, a UPB should reflect the local cost of construction minus contractor profit and overhead. Thus a contractor’s bid co-efficient for standard hour construction is generally in the 1.10-1.30 We believe a properly researched UPB should enable a contractor to submit a co-efficient of greater than 1.0.

Contract 130
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

JOB Order Contracting FAQs

Job Order Contracting

For example, if a UPB should reflect the local cost of construction minus contractor profit and overhead. Thus a contractors bid co-efficient for standard hour construction is generally in the 1.10-1.30 We believe a properly researched UPB should enable a contractor to submit a co-efficient of greater than 1.0.

FAQ 131
article thumbnail

CULTURE, TECHNOLOGY/SOCIAL MEDIA, & BIM

Building Information Management

BIM (Building Information Modeling), cloud computing, and social media are disruptive technologies which are altering the basic foundations of the AECOO sector (Architecture, Engineering, Construction, Owners, and Operations). BIM (Building Information Modeling), cloud computing, and social media are disruptive technologies which are.

BIM 40
article thumbnail

Top ten software for estimating and bidding

Construction Cost Estimating

Sage facilitates you to produce bids rapidly, precisely and positively with takeoff and cost databases. Sage Estimating also facilitates forecasting the labor, raw material and other overhead costs so that the contractors can arrange & deliver correct bids. Besides, customized reports can also be generated.

Bidding 40
article thumbnail

Sustainability of DOD Buildings – Reuse of Existing Buildings

Building Information Management

Cost estimates and construction bid requests should include materials quantities in addition to costs to evaluate and validate GHG impacts. Consolidation of procurement – lower overhead cost and procurement cost. Contract, Project, Estimating, Document Management. Automated Technical Evaluations. Visual Estimating.

article thumbnail

A glossary of terms with reference to Construction Cost Estimating

Construction Cost Estimating

B Basis of estimate (BOE) - a document which describes the scope basis, pricing basis, methods, qualifications, assumptions, inclusions, and exclusions. Bill of quantities (BOQ) - a document used in tendering in the construction industry in which materials, parts, and labor (and their costs) are itemized.