Remove Bidding Remove Change Orders Remove Life Cycle Remove Reference
article thumbnail

Why the majority of CMMS System Implemenations Fail

Building Information Management

For example, virtually none of the major (or even minor) CMMS or IWMS technology vendors incorporate a standardized cost database, such as RSMeans, from which users could compare their actual material, equipment, and labor costs against a localized reference standard. “Just plain stupid”, right? That’s the hard question.

article thumbnail

Collaboration, Transparency, Accuracy, Process, and supporting Technology – The Keys to Improved Productivity for Building Construction, Renovation, Repair, and Sustainability

Building Information Management

While its true that cloud computing is an enabler, with its role to support the cost effective integration of various knowledge domains and technology silos; the underlies processes linked to a collaborative project delivery method focused upon life-cycle management is the critical aspect.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

The Ultimate Guide to Choosing the Best Project Delivery Method

Autodesk Construction Cloud

While a project’s ultimate goal is a successful completion, the steps it takes to get there are critical to profits and project’s life cycle. During this process, consider how much wiggle room is available for change orders, most likely an inevitable occurrence once a project is underway and can be costly if not well planned.

Risk 52
article thumbnail

Built Environment Life-Management, BIM, LEAN, and Efficient Project Delivery

Building Information Management

Life-cycle Management 101. BIM (Building Information Modeling) is the life-cycle management of the built environment supported by digital technology. As such it serves as a shared knowledge resource for information about a facility, forming a reliable basis for decisions during its life cycle from inception onwards.

BIM 40
article thumbnail

CULTURE, TECHNOLOGY/SOCIAL MEDIA, & BIM

Building Information Management

Unproductive ad hoc processes traditionally associated with the design, construction and management of the built environment are being replaced by robust life-cycle management and efficient project delivery methods. management of the built environment are being replaced by robust life-cycle management and efficient project.

BIM 40
article thumbnail

Job Order Contracting – Best Practices Implementation

Building Information Management

The contractor(s) may submit sample bids and a coefficients (a multiplier(s) to be applied to the referenced unit price book. Best practice Job Order Contracts typically rely upon the Owner’s existing construction design specifications, and the UPB. Subcontract bid. Terms as Used in All Documents. An Identification (I.D.)

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 11 13 Advertisement for Bids. 00 11 16 Invitation to Bid. 00 24 13 Scopes of Bids. Scopes of Bids (Multiple Contracts). Scopes of Bids (Multiple-Prime Contract). 00 25 13 Pre-Bid Meetings. 00 41 00 Bid Forms. 00 41 13 Bid Form – Stipulated Sum (Single-Prime Contract). Requirements.