article thumbnail

THE ESTIMATING PROCESS FROM A TO Z

Construction Cost Estimating

For example, if you''re obtaining one contractor bid for roofing, covering all the things listed therein class, simply enter the value once the heading Roofing. You’ll mark all the opposite line things lined by the roofing bid as atomic number 11. I like to recommend chase these value breakdowns in individual Itemized Bid Worksheets.

article thumbnail

#104:  Proving Lost Productivity Claims

NH Construction Law

At the bid stage contractors estimate the manhours needed to complete their contracts by anticipating what those conditions will be. Because it requires a comparison of impacted and unimpacted periods of work, “measured mile” methodology on a single project won’t be available if the entire work was impacted from Day One.

Claims 40
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

BIM, Value Management, Life-cycle Cost Management

Building Information Management

Analytical comparisons of the two techniques are then presented in section V as discussion. LCC enables a practical economic comparison of the alternatives, in terms of both the present and future costs. In section IV, the principle and methodology of value management were discussed.

article thumbnail

Job Order Contracting – Best Practices Implementation

Building Information Management

The contractor(s) may submit sample bids and a coefficients (a multiplier(s) to be applied to the referenced unit price book. Competitive quotations shall be secured wherever feasible, and in all instances, when requested by the Owner. Subcontract bid. All cash discounts should be deducted in determining material costs.

article thumbnail

BIM Glossary Terms and Definitions – NBIMS-US – 2013

Building Information Management

Examples of delivery methods for design and construction services include “Design-Bid-Build” (DBB), “Design-Build” (DB), “Integrated Project Delivery” (IPD), “Job Order Contracting” (JOC), and “Private Public Partnerhip” (PPP). Project Team Contract Agreements. Harmonization. .

BIM 40