Remove Bidding Remove Estimating Remove Software Remove White Paper
article thumbnail

Learning about Job Order Contracting?

Job Order Contracting

In terms of procurement JOC is bid indefinite delivery, indefinite quantity (IDIQ) contract between a facility owner and a professional JOC construction contractor. Can owners create independent estimates? Owners can develop detailed cost proposals by line item and prepare an independent estimate. via 4bt.us. via 4bt.us.

Contract 213
article thumbnail

What to Look for When Shopping for Construction Estimating Software

Construction Business Owner

What to Look for When Shopping for Construction Estimating Software. Tips to help you choose the right estimating software. Estimating software has become a necessity for contractors looking for a faster solution for their estimating and bidding. Estimating. foundation software.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Job Order Contracting – Lean Construction History

Job Order Contracting

Traditional design-bid-build (DBB) construction delivery was too inefficient for the large numbers of renovation, repair, and sustainment/maintenance projects. The total of the estimate is then multiplied by a coefficient. Job Order Contracts should include a minimum and total estimated maximum volume for each year and for the term.

Contract 100
article thumbnail

Job Order Contracting – JOC – Best Management Practices

Building Information Management

Experience – One must be an experienced estimator and experienced RSMeans, or any RSMeans-based JOC. Both need to have sufficient experience in estimating, construction, teaming, and be willing to truly share information. There are multiple case studies, white papers, and research documents. Annual volume.

article thumbnail

Collaboration, Transparency, Accuracy, Process, and supporting Technology – The Keys to Improved Productivity for Building Construction, Renovation, Repair, and Sustainability

Building Information Management

How can multiple cost estimators share information on a project, or communicate with Owners, Contractors, AE’s, Subs, etc… if they aren’t speaking the same language? 4Clicks.com – premier software for cost estimating and efficient project delivery – JOC, SABER, IPD, SATOC, MATOC, MACC, POCA, BOA, IDIQ.

article thumbnail

Using RSMeans Cost Data for Job Order Contracting – JOC – October 2013

Building Information Management

The follow are excerpts from a RSMeans White Paper. Owners have reams of rules and regulations to follow in order to put a project out for bid fairly. Job Order Contracting offers an alternative to traditional bidding processes. This database would be referenced for estimating, negotiating, project control and closeout.

article thumbnail

A Guide to BIM

Viewpoint Construction Technology

But construction contractors’ investment in BIM varies widely , with 27 percent of companies in the United States reporting having a BIM department, while another 28 percent say they don’t bid on BIM projects at all. More accurate bids, since models allow estimators to better identify risks.

BIM 137