Remove BIM Remove Change Orders Remove Contract Remove Legal
article thumbnail

Why the BIM Revolution Fizzled

Job Order Contracting

The “BIM Revolution” fizzled since technology was never the problem. LEAN AECOO / Facilities Management will eventually become the norm, if not a legal requirement. The post Why the BIM Revolution Fizzled appeared first on 4BT.

BIM 100
article thumbnail

OpenJOC – LEAN Construction Delivery / Job Order Contracting

Job Order Contracting

OpenJOC, a term coined by Four BT, LLC, is the deployment of Job Order Contracting based upon LEAN construction delivery best management practices. Relationships are critical to LEAN construction and successful Job Order Contracts. They drive lower overall costs and virtually eliminate legal disputes.

Contract 100
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

4 No-Brainer Workflows with Autodesk Construction Cloud Connect 

Autodesk Construction Cloud

Using ACC Connect, you can integrate files and create custom workflows between SharePoint and Autodesk Build, Autodesk Docs, BIM 360, or PlanGrid. . ACC Connect lets you integrate files between Egnyte and Autodesk Build, Autodesk Docs, BIM 360, or PlanGrid. 3: Contract Management. 2: Project Management. DocuSign .

Autodesk 105
article thumbnail

Job Order Contracting - Untitled Article

Job Order Contracting

Or… Job Order Contracting is a LEAN procurement and project delivery method for facilities repair, renovation, and minor new construction. It can deliver major benefits, but only if fundamental LEAN processes are adhered to and the real property owner actively participates and provides leadership.

article thumbnail

BIM Collaboration – Fact or Fiction?

Building Information Management

BIM Collaboration – Fact or Fiction. The design-bid-build construction delivery method and associated practices such of awarding contracts to the lowest bidder do little more than a fuel to the fires of waste, protracted project timelines, change orders, and legal disputes.

BIM 55
article thumbnail

Better Manage Construction Costs Schedules and Quality

Job Order Contracting

The errors and poor processes result in change orders, project delays, and legal disputes. The fundamental reason for poor outcomes is the failure to implement and properly manage robust and integrated LEAN planning, procurement, and project delivery processes.

Schedule 163
article thumbnail

BIM Strategy, Collaboration, and Interoperablity… Getting it right from square one.

Building Information Management

Construction delivery methods are at the center of this ongoing transformation as they dictate the structure, tone, and legal requirements of any project. Job Order Contracting Process. BIM is “the life-cycle management of the built environment supported by digital technologies” BIM Framework.

BIM 40