Remove BIM Remove Document Remove Estimating Remove Life Cycle
article thumbnail

Best Construction Cost Estimating Solution

Job Order Contracting

Here is a recommended list of considerations if you are seeking the best construction cost estimating solution for your organization. Collaborative environment – Even if there is only one estimator, it is critical to share current, actionable information with multiple internal and external parties. and Detailed BIM Information.

article thumbnail

Line Item Construction Cost Estimating – 2020 and Beyond!

Job Order Contracting

Detailed line item construction cost estimating is a prerequisite to obtaining best value outcomes for facilities / built infrastructure repair, renovation maintenance, sustainability, and new construction projects. A locally researched detailed line item construction cost estimating database plays a key role in this regards.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

FM & Cost Estimating Tools in the Cloud & Free – 2018 National Commercial Construction Cost Database

Job Order Contracting

A Facilities Management platform to manage the entire building’s life cycle, with a detailed U.S. Manage buildings, teams, projects, documents, drawings, estimates… anywhere, anytime. Also view link documents, add notes, etc. to BIM files. Construction Cost Database … both FREE! link] Watch the video!

article thumbnail

LEAN Construction Project Delivery and Facilities Operations, Maintenance, and Life-cycle Management

Job Order Contracting

Clearly defined and documented roles, responsibilities, workflows. Cost estimating. Life-cycle Management. COBie is an information exchange specification for the life-cycle capture and delivery of information needed by facility managers. Focus upon client requirements and best value outcomes. Construction.

article thumbnail

Construction Document Information Management

Job Order Contracting

Construction Document Information Management is central to productivity improvement. Construction Document Information Management. Streamlining Construction Document Information Management processes is an essential step towards improving productivity, quality, and overall value for all stakeholders. 2017, Cholakis, P.

article thumbnail

LOD – Level of Development – BIM – Life-cycle

Building Information Management

Level of development (LOD) relative to the life-cycle management of the built environment (BIM) should have a solid framework relative to ONTOLOGY. While the definition of “life-cycle” has many permutations, and is likely to undergo ongoing improvement, the relationship to LOD needs to be developed in parallel.

article thumbnail

Integrated Project Delivery Software and Support Services

Job Order Contracting

Upload and share documents and make them available to your whole team – including PDF, Word and Excel files, images and videos. Upload and share documents and make them available to your whole team – including PDF, Word and Excel files, images and videos. Defined common data environment. Key performance indicators.

Software 150