Remove Books Remove Drawings Remove Negotiation Remove Overhead
article thumbnail

Army Job Order Contracts FAIL to meet AFARS requirements MOST OF THE TIME

Job Order Contracting

The J OCPB (JOC Price Book: reflects the current local costs in detail for construction tasks expected to be performed in the geographical area of the base contract with the primary use of developing a detailed line-item price. This is a national average cost book that DOES NOT REFLECT LOCAL COSTS. 5117.9001 Definitions.

Contract 226
article thumbnail

Setting up a Job Order Contract Using Best Management Practices

Job Order Contracting

“Coefficient” – a numerical factor that represents costs (generally indirect costs) not considered to be included in the “Unit Price Book” (UPB) unit prices (e.g., Informal (shop) drawings, incidental to the job, reflecting the plan of action and the completed project, are anticipated under JOC. JOC Characteristics. (a)

Contract 100
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Job Order Contract Execution Guide – Sample Template

Job Order Contracting

The JOC Contract shall use the current calendar year issue of locally researched unit price cost data equivalent to the OpenJOC(TM) Unit Price Book – UPB (subsequently referred to as UPB) with updates as applicable, as a basis for unit cost. coefficient (reference table of allowable overhead). authorization. Job Conditions.

Contract 100
article thumbnail

JOB ORDER CONTRACT Glossary / Terms / Defintions – JOC , JOB ORDER CONTRACTING

Building Information Management

invoices and the appropriate unit price book for JOC work performed for under the contract. Cost Catalog / Unit Price Book / UPB / Unit Price Guide / UPG. to 1.20 multiplier applied to the the total of the line items for a project or task order estimate. It typcially includes all overhead items such as. AUDIT CYCLE.

article thumbnail

Best Practice Job Order Contracting

Job Order Contracting

Coefficient” means a numerical factor that represents costs (generally indirect costs) not considered to be included in “Unit Price Book” unit prices (e.g., Coefficients proposed by offerors are multiplied times the unit prices in the Unit Price Book to price a job or project on individual orders. As used in this subpart –.

Contract 100
article thumbnail

Job Order Contracting – JOC – DOD – AFARS

Building Information Management

Coefficient” means a numerical factor that represents costs (generally indirect costs) not considered to be included in “Unit Price Book” unit prices (e.g., Coefficients proposed by offerors are multiplied times the unit prices in the Unit Price Book to price a job or project on individual orders. As used in this subpart –.

article thumbnail

Job Order Contract – Frequently Asked Questions

Job Order Contracting

Required software, Unit Price Book, other “tools”, and training etc. What is a Unit Price Book? Job Order Contracts require a unit price book, UPB. Job Order Contracts require a unit price book, UPB. What are the characteristics of a “good” unit price book? How often is the UPB updated?

Contract 100