Remove CAD Remove Compensation Remove Modeling Remove Risk
article thumbnail

Hilti Unveils Semi-Autonomous Overhead Drilling Robot, Called Jaibot

Construction Junkie

The Hilti Jaibot is a completely cordless overhead drilling solution that can automatically locate and drill holes for overhead MEP anchors based upon a BIM or CAD layout. But leveraging the opportunities offered by digitization will compensate for it.

article thumbnail

BIM IP

Building Information Management

For some reason BIM authors (architects, engineers, etc) think that because they create the initial BIM information they have the right to full control and to charge for the BIM model throughout the life of the building. The architect doesn’t model ductwork, they use the mechanical engineer’s model.

BIM 40
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

20 construction industry trends to watch in 2020

Building Radar

Furthermore, forecast models calculate realistic time constraints for project control. Analysis and prioritization of the numerous risk factors are also supported. Many team players, much data: one cloud for all The magic of Building Information Modeling (BIM) succeeds thanks to the cloud.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

If arc flash labeling is not provided, assume hazard risk category “Dangerous” and perform operations in the following sequence: De-energize equipment 2. If arc flash labeling is not provided, assume hazard risk category “Dangerous“ and perform operations in the following sequence: 1. Remove covers 3. De-energize equipment 2.