article thumbnail

The accuracy fallacy

DebunkTheBIM

“I hate accuracy in CAD!” I also recall, early in my career, small-scale-builders giving me a hard time on construction sites for dimensions on my drawings ending with 2,3,7 (mm); Accuracy is a tricky thing – a double edged sward. Applying uncontrolled dimensions is a dangerous practice, BIM/CAD accuracy will not help you there.

CAD 48
article thumbnail

Over 275 Partners Now Integrate with Autodesk Construction Applications 

Autodesk Construction Cloud

Billy streamlines the collection and verification of compliance documents, such as Certificates of Insurance, business licenses, and certified payroll. DataSeer allows construction professionals to identify, extract, and convert unstructured drawings and documents into standardized output formats, including CSV and CAD files automatically.

Autodesk 118
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Critical Issues and BIM – NIBS buildingSMART alliance conference – January 7-11, 2013

Building Information Management

Tom Gay manages worldwide CAD and GIS services, site plan documentation and engineering document management services for The Factory Mutual Insurance Company (FM Global). Led CAD selection and implementation projects transitioning FM Global from pencil/paper-pen/linen to electronic production. 270 Central Avenue.

BIM 45
article thumbnail

Critical Issues and BIM – NIBS buildingSMART alliance conference – January 7-11, 2013

Building Information Management

Tom Gay manages worldwide CAD and GIS services, site plan documentation and engineering document management services for The Factory Mutual Insurance Company (FM Global). Led CAD selection and implementation projects transitioning FM Global from pencil/paper-pen/linen to electronic production. 270 Central Avenue.

BIM 40
article thumbnail

The Construction Industry Council (CIC)’s Protocol on building information modelling (BIM) is out, and the news is ALL GOOD!

DebunkTheBIM

Admittedly, I have not checked them all out individually, but the consensus is there (again) – BIM as described by CIC is here to stay, they have the best recipes on how to do it, no worries regarding insurers, trust them… Well’ let’s look at this insurer issue again! of the BIM Maturity Chart; (i.e. of the BIM Maturity Chart; (i.e.

BIM 48
article thumbnail

List of Common Construction Abbreviations

Job Order Contracting

AIA: American Institute of Architects, American Insurance Association. CAD: Cadmium, Computer-Aided Drafting. DWG: Drawing. DWGS: Drawings. ADJ: Adjust, Adjustable, Adjacent. AF: Above the Floor. AFF: Above Finished Floor. AGA: American Gas Association. AGG: Aggregate. AGGR: Aggregate. AIC: Amperes Interrupting Circuit.

article thumbnail

Dynamic Blocks inside of ABS - Visibility Solution

CAD Shack

I do this because once a drawing is saved and re-opened, the problem ceases to exist. I'm going to draw the entire thing inside of the Block Editor, but if you already have blocks, just insert them into the Block Editor. For objects, insure you pick not only all of the visible or not geometry, but also the parameters and actions.

AutoCAD 40