article thumbnail

The lifecycle of a detail – BIM and butterflies

DebunkTheBIM

And I mean, everything, getting IFC drawings, as-builts, shop-drawings, or magical, know it all 3-7D (+) models. Then, likely the pieces will be designed by a specialist subcontractor, who will prepare connection shop drawings for someone to approve. That sentence I just wrote, is a mouthful, but do read it again.

BIM 60
article thumbnail

Latest software for estimating & designing architectural projects

Construction Cost Estimating

Thus the architect get benefitted as they can solve the complexities before the drawing are sent to the General contractors. This sophisticated tool is intended for designing and remodeling houses, kitchens, baths, decks, landscapes, and interiors. It comes up with powerful CAD tools and many extra features for advanced users.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Top ten software for estimating and bidding

Construction Cost Estimating

Download CostX CostX can instantly capture exact measurements from scanned, PDF and CAD drawings together with formation of automatic BIM quantities from 3D/BIM models. The application supports digitizer integration, file integration (CAD, PDF, etc), and 2D takeoff. Users can also evaluate subcontractor and supplier quotes.

Bidding 40
article thumbnail

Leading the Home Building Industry: Pro Builder's 2021 Forty Under 40

Pro Builder

The project proposes sustainable solutions for Detroit’s 48204 ZIP code • Led the initiative to transition from CAD to BIM construction documentation and introduced several technical innovations to streamline operations • Created a custom BIM content library with hundreds of host components and subcomponents. Scott Strayer, 37 .

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

building operating manual, controls as-built drawings, commissioning reports, re-commissioning reports) 7. Examine the list for any omissions due to renovation, remodel, program changes, and newly added equipment. Check all external restrictors for proper size and to verify the restrictor is installed per controls drawings.