JOC Contractor Evaluation

Job Order Contracting

JOC contractor evaluation is an ongoing process, begining with their response to a Job Order Contract Request for Propsals for design-builders and continuing throughout the life-cycle of the JOC Program. Here is a considerations for JOC contractor evaluation. Timely project mobilization and start.

article thumbnail

The Life-cycle of a Job Order Contract

Building Information Management

Job Order Contract Life-cycle. A “Pre-proposal meeting” is held between the “JOC Program Manager” (PM), user/client, and contractor to generally define a work need. The Contractor has a specified period of time to complete and forward a proposal/contractor estimate. Proposal Review.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Credible Construction Estimate Core Elements

Job Order Contracting

Secondary data sources , such as contractor and subcontractor quotes are secondary data sources and should not be exclusively relied upon. #2 Typical construction project stake holders include: Owners (management, engineering, contracting/procurement, building users), Contractors, Subcontractors, and Designers/Architects.

article thumbnail

Improving Renovation, Repair, and Maintenance Project Delivery

Job Order Contracting

The way to deliver 96%+ of renovation, repair, and maintenance projects on-time, on-budget, and at the appropriate level of quality is to enable collaboration with contractors and other expert service providers. – 2016, Arizona State University – Job Order Contracting Performance Survey-2015.

article thumbnail

Integrated project delivery method

Job Order Contracting

An integrated project delivery method is arguably required in order to achieve desired quality, satisfaction, timing, and cost for over 90% of renovation, repair, or new construction projects executed. A detailed, full transparent line item construction cost estimate is critical for improving collaboration and reducing change orders. .

article thumbnail

Behind the Build: Interview with Mike White, Director of Design and Construction at North Point Hospitality

Autodesk Construction Cloud

Mike White , Director of Design and Construction at North Point Hospitality (NPH) , is one individual who possesses these traits and abilities. I initially started at North Point, managing projects, then moved to Senior Project Manager and ultimately the Director of Design and Construction. I'll start at the beginning—my family.

Design 80
article thumbnail

BEST VALUE & COMPLIANT Construction Planning, Procurement, And Project Delivery

Job Order Contracting

It is not design-bid-build, design-build, CM@R, LastPlanner(TM), black belt, kaizen, et al. LEAN, BEST VALUE construction, planning, procurement, and project delivery is embodied with collaborative processes and frameworks such as integrated project delivery, IPD, and LEAN job order contacting (i.e. the OpenJOC(TM) Solution).