Credible Construction Estimate Core Elements

Job Order Contracting

A credible construction cost estimate is required prior to engaging in procurement. The follow elements are common to a credible construction cost estimate. Credible Cost Estimate Core Elements #1 Objectivity – The information used and those invovled in the creation of the construction cost estimate must be objective.

article thumbnail

The Life-cycle of a Job Order Contract

Building Information Management

Job Order Contract Life-cycle. At the Pre-Proposal Meeting, the PM should set up a date for the pre-construction “site visit” A designated form with an appropriate amount of information requesting JOC work is completed and forwarded to the “Contract Specialist” Proposal Request.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

LEAN JOC – Job Order Contracting

Job Order Contracting

The approach invests more resources earlier in the Project life-cycle. Work scope is developed and communicated is more detail and more effectively, resulting in the avoidance of traditionally prevalent delays, change orders, and associated skyrocketing costs. Asset Life-cycle Total-cost-of-ownership (TCO) Management www.4BT.us.

Contract 132
article thumbnail

BIM and The Role of a Construction Cost Estimator

Building Information Management

Professional construction cost estimators are critical to any collaborative, transparent, and productive BIM solution. Experienced cost estimators who appropriately leverage technology and embrace collaboration will excel.

article thumbnail

Improving Renovation, Repair, and Maintenance Project Delivery

Job Order Contracting

As a result of 1800+ tests, researchers have concluded that a primary cause in low project performance (time, cost and customer satisfaction) is the traditional owner-vendor relationship in which the owner uses a design, bid and build (DBB) approach. – 2016, Arizona State University – Job Order Contracting Performance Survey-2015.

article thumbnail

BEST VALUE & COMPLIANT Construction Planning, Procurement, And Project Delivery

Job Order Contracting

It is not design-bid-build, design-build, CM@R, LastPlanner(TM), black belt, kaizen, et al. LEAN, BEST VALUE construction, planning, procurement, and project delivery is embodied with collaborative processes and frameworks such as integrated project delivery, IPD, and LEAN job order contacting (i.e. the OpenJOC(TM) Solution).

article thumbnail

Job Order Contracting Done Right! Open, Best Value, Efficient

Job Order Contracting

Job Order Contracting done right, that’s what the OpenJOC(TM) Job Order Contracting Framework is all about. An open, objective, independent and verifiable JOC Cost Estimating, Project Management, and Document Management System for real property owners, architects, contractors, facilities management, and oversight groups.

Contract 100