Remove Change Orders Remove Documentation Remove Legal Remove Presentations
article thumbnail

Paper to Paperless: Webinar on Construction Documentation and Legal Disputes

Best Practices Construction Law

You can learn best practices for documentation and record management in this 90-minute webinar — From Paper to Paperless: Controlling Construction Documentation, Improving Record Management and Identifying Risk in an Electronic Age. Are electronic documents subject to the same discovery rules as paper documents?

article thumbnail

Preconstruction Meeting: A Quick Guide to Success   

Autodesk Construction Cloud

They ensure everyone is on the same page from the get-go, on topics as diverse as how change orders how the chain of communication will be handled on site. They also try to identify special considerations and forestall potential areas of complication that can lead to change orders.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Credible Construction Estimate Core Elements

Job Order Contracting

GAO, 2009 The associated processes for developing a credible construction cost estimate are equally well documented. “Despite the fact that these basic characteristics have been published and known for decades, we find that many agencies still lack the ability to develop cost estimates that can satisfy them”. –

article thumbnail

Estimating Construction Costs for Job Order Contracts

Job Order Contracting

A JOC Operations Manual and/or JOC Execution Guide must be present and a part of the the JOC contractual documents. A low change order rate 5%-16% or lower. Elimination of legal disputes. Key performance indicators related to Estimating Construction Costs for Job Order Contracts: Average work order/project price.

article thumbnail

Navigating challenges in construction administration

BD+C

Rebekah Schranck, AIA Contractors Designers / Specifiers / Landscape Architects Architects Building Owners Construction Administration presents its fair share of challenges in the architectural industry, from managing clients' change of heart in the midst of construction to dealing with contractors that are reluctant to revise their work.

article thumbnail

OpenJOC – LEAN Construction Delivery / Job Order Contracting

Job Order Contracting

They drive lower overall costs and virtually eliminate legal disputes. That said proper and well-defined relationships must be established, documented, and maintained from the day one, and a competent Owner with good leadership skills plays a vital role. In some cases, consultants are hired to assist in managing a Job Order Contract.

Contract 100
article thumbnail

That’s A Goocher: SD Court Finds Enforceable Construction Contract Despite Lack of Time Component

Best Practices Construction Law

However, there were numerous written documents such as a proposal, invoices, and change orders that had been either signed by or transmitted between the parties. Missing from the September document was a timeline for completion of the work.