Remove Chief Architect Remove Documentation Remove Drawings Remove Software
article thumbnail

Latest software for estimating & designing architectural projects

Construction Cost Estimating

Latest software for estimating & designing architectural projects. Estimating for architect is required to find out the price of projects before the commencement of bidding process. If the price surpass the budget then the architect have to make redesign until it come up with the budget. IMSI TurboFLOORPLAN Instant Architect.

article thumbnail

Revit Beginners: In-place Cavity Walls

Revit Beginners

We used to complain that CAD drawings looked horrible and now that concept has nearly been forgotten. Once the principals saw the data loss and loss of efficiency from such workarounds they got over the look of the documents. especially as documents became a secondary deliverable to the coordinated BIM. Other BIM Software.

Revit 40
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Revit Beginners: Sort by Submittal Package

Revit Beginners

We decided that we also wanted to be able to sort the sheets in our project browser (and our drawing lists) by Submittal Package. and check the category Drawing Sheets. Drawing List. Leave the name Drawing List. The Drawing List on our coversheet shows ALL the drawings from ALL the different packages.

Revit 40
article thumbnail

Revit Beginners: The Project That Almost Could

Revit Beginners

To add to the complexity, the as-built drawings we had on file were not accurate to the true construction of the existing structure because the original architect had improvised the design during construction. The model is not clean enough to develop construction documents so we have passed along that task to another architect.

Revit 40
article thumbnail

Revit Beginners: The Data Manager

Revit Beginners

HOKs CAD Standards describe a Data Leader as someone "responsible for the execution of the CAD strategy including, the use of BIM, the folder structure and file-naming strategy, use of templates, and documenting specific project procedures." And not just our models but also the drawings we are getting from consultants. Chief Architect.

Revit 40
article thumbnail

Revit Beginners: Revit 2010: New Coordinates Icons

Revit Beginners

you can draw a simple building and link in a simple building (by shared coordinates) and move these two icons around a bit (clipped and unclipped) to see how the two models react or. It's a bit of a pity that these things do not seem to be so wll documented in the helpfiles. Other BIM Software. Chief Architect.

Revit 40
article thumbnail

Critical Issues and BIM – NIBS buildingSMART alliance conference – January 7-11, 2013

Building Information Management

Tom Gay manages worldwide CAD and GIS services, site plan documentation and engineering document management services for The Factory Mutual Insurance Company (FM Global). As Chief Operating Officer, David is responsible for developing EastCoast’s overall Product and Business Strategies. 270 Central Avenue.

BIM 45