Remove Commissioning Remove Compensation Remove Design Remove Negotiation
article thumbnail

December 2014 newsletter

FDR Safety

Filing the Notice of Contest puts a hold on the abatement deadline until the matter is settled or the Review Commission or a court issues a final order upholding the citation. Department of Labor to see if you can arrive at a negotiated settlement. (Do Any appeal from the hearing officer goes to the three-member OSHA Review Commission.

OSHA 120
article thumbnail

Environmental Regulations in Construction: What Contractors Need to Know

Levelset

Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). The Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), also known as “Superfund,” covers improper disposal or intent to dispose of hazardous waste. View the list of chemicals subject to CERCLA here. Catellus Development Corp. ,

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

A glossary of terms with reference to Construction Cost Estimating

Construction Cost Estimating

This value usually does not include the preplanning, site or right of way acquisition, or design costs, and may not include start-up and commissioning costs. Examples: project management & coordination 47, temporary facilities & controls, cleaning & waste management, commissioning. Example: Wage rate is 10.00/hour,

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 41 53 Bid Form – Design/Build (Single-Prime Contract). 00 41 56 Bid Form – Design/Build (Multiple-Prime Contract). 00 42 53 Proposal Form – Design/Build (Single-Prime Contract). 00 42 56 Proposal Form – Design/Build (Multiple-Prime Contract). 00 45 26 Workers Compensation Certificate Schedule.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 41 53 Bid Form – Design/Build (Single-Prime Contract). 00 41 56 Bid Form – Design/Build (Multiple-Prime Contract). 00 42 53 Proposal Form – Design/Build (Single-Prime Contract). 00 42 56 Proposal Form – Design/Build (Multiple-Prime Contract). 00 45 26 Workers Compensation Certificate Schedule.

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

TVA Economic Development Loan Fund: A multimillion-dollar revolving loan program designed to stimulate investment and job creation in the TVA region. 573), was enacted in 1987 to stimulate business and industrial growth in designated areas of the state that are considered economically depressed. In December 2002, the former U.S.

Income 108
article thumbnail

North Dakota Incentives and Workforce Development Guide

Buisness Facilities Contributed Content

State Water Commission funds, not exceeding $20,000 per borrower, may be used to supplement Ag PACE funds for the purchase of irrigation equipment on new irrigated acreage. MATCH Program: Designed to encourage and attract financially strong companies to North Dakota. Recipients of Biofuels PACE are not eligible for regular PACE funds.