article thumbnail

#127:  Subcontract "Flow Down" of Prime Contract Terms

NH Construction Law

Commercial construction subcontracts frequently incorporate by reference provisions of the prime contract between the owner and the general contractor, often with language requiring the subcontractor to assume toward the general contractor all duties owed by the general contractor to the owner. Brait Builders Corp. , 65, 78, 972 N.E.2d

article thumbnail

What Certifications Does A Crane Need To Operate On Construction Sites?

Construction Marketing

NCCCO Certification The National Commission for the Certification of Crane Operators (NCCCO) is a crucial authority in certifying crane operators of various types. Most construction companies and project owners require NCCCO-certified operators for bidding and subcontracting. They offer mobile, tower, and overhead crane certifications.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Construction Project Closeout

cnstrctr

In order to get occupancy you need a number of documents from your consultants and various agencies but ultimately it’s the building inspector who grants occupancy. Some of the documents they will be looking for include: Letters from each of the consultants confirming that the project is built to drawings and specs.

article thumbnail

How to Get Paid on Washington State Public Projects

Levelset

Washington’s public payment bond claim laws cover all public works projects commissioned by a state or local government entity that have a contract value of at least $150,000 — and it’s additionally possible to make a lien claim against unpaid retainage funds on certain public projects. Washington State bond claim laws. Learn more.

article thumbnail

Construction Jobsite Safety: Strategies and Resources for Worker Well-Being

Pro Builder

Because of this liability, Foulke advises builders to have “really good agreements” with their trade partners that spell out in specific detail that they will follow OSHA regulations, wear fall protection gear, and promise not to subcontract (or “sub-sub”) any work within their scope without the builder’s approval. Make safety the No.

Safety 72
article thumbnail

Rory Woolsey's Construction Estimating Blog: Mark It Up!

Rory Woolsey

With general contractors subcontracting the bulk of their projects this is a reasonable place to start the marking up. A project at a conceptual design phase would suggest a different markup than one that is 90% complete with construction documents. The phase of design that a project is in will also influence the markups used.

article thumbnail

40 Under 40: Champions of Construction 2023

Autodesk Construction Cloud

During his time at Hydro Tasmania he has built a team from the ground up, enhancing the skills and internal project teams capability, continuing to ensure collaboration, open learnings and conversations and to persevere building on standardization of designs where applicable and ensuring consistency of delivered asset documentation.