Remove Compensation Remove Design Remove Negotiation Remove Overhead
article thumbnail

Job Order Contract Execution Guide – Sample Template

Job Order Contracting

administration of the Job Order Contract (JOC), a Contract designed to provide the ORGANIZATION NAME with a flexible and responsive contractual capability in support of their renovation, repair, and minor new construction services needs. coefficient (reference table of allowable overhead). JOB ORDER CONTRACT (JOC) EXECUTION GUIDE.

Contract 100
article thumbnail

No Damages for Delay: What It Means and What Can You Do

Best Practices Construction Law

If this happens, you want to know that you can recover your losses for additional labor, extended overhead, and other monetary damages. there were many design changes that were not communicated to other contractors, which caused delays. As a construction contractor, your work can be delayed for reasons beyond your control.

Claims 48
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

A glossary of terms with reference to Construction Cost Estimating

Construction Cost Estimating

This value usually does not include the preplanning, site or right of way acquisition, or design costs, and may not include start-up and commissioning costs. See also Overhead, Indirect cost. See also, Overhead, General & Administrative Cost, Distributable. Construction cost - the total cost to construct a project.

article thumbnail

What are Simplified Acquisition of Base Engineer Requirements (SABER)

Building Information Management

Offerors propose coefficients for costs such as overhead, profit, minimum design costs, G&A expenses, bond premiums, and gross receipt taxes. This approach recognizes that a contractor’s overhead decreases as workload increases. Minimum Design. Typically, minimum design for SABER is up to 35%.

article thumbnail

Job Order Contracting – Best Practices Implementation

Building Information Management

Best practice Job Order Contracts typically rely upon the Owner’s existing construction design specifications, and the UPB. A job order (JO) or task order (TO) is the contractual document issued by the purchasing/procurement or its designated representative to the Contractor. Specifications. Job Orders / Task Orders.

article thumbnail

Best Practices for Multiple Award IDIQ – Task and Delivery Order Contracting

Building Information Management

The contractor’s coefficient is based on cost elements such as overhead, profit, minimum design costs, G&A expenses, bond premiums, and gross receipt taxes. Interagency usage can serve to reduce the overhead associated with multiple acquisitions. Use of Multiple Award Contracts to Buy Information Technology (IT).

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 41 53 Bid Form – Design/Build (Single-Prime Contract). 00 41 56 Bid Form – Design/Build (Multiple-Prime Contract). 00 42 53 Proposal Form – Design/Build (Single-Prime Contract). 00 42 56 Proposal Form – Design/Build (Multiple-Prime Contract). 00 45 26 Workers Compensation Certificate Schedule.