Remove Design Remove Inspections Remove Risk Remove Roads
article thumbnail

INSPECTION OF A BRIDGE STRUCTURE - The Constructor

The Constructor

Hence, the bridge must be regularly inspected and maintained for the benefit of its users. There are three levels of inspection: 1. General inspection: Usual inspection of representative parts of a structure. Carried out nor more than two years after last general or principal inspection. After a major incident.

article thumbnail

Derailment inquiry exposes risk management shortfalls

Construction Law

Other inquiries are being made jointly by Police Scotland, British Transport Police and railway regulator the Office of Rail and Road. So part of the drainage system had not been inspected at all since 2012.

Risk 52
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Housing, Industrialized: Your Road Map to Off-Site Construction

Pro Builder

Housing, Industrialized: Your Road Map to Off-Site Construction. To assist those interested in making the journey, Pro Builder and the Pittsburgh-based Housing Innovation Alliance initiated a comprehensive “IC Road Map” with the help of a working group consisting of home builders, suppliers, researchers, and other industry experts.

Roads 116
article thumbnail

The Preconstruction Phase: Understanding the Process & Risks

Levelset

Before a construction project can begin, there is a lot of planning, number-crunching, designing, and scheduling that needs to occur. An architect, designer, or design-bid contractor will perform planning and engineering services for a prospective project owner, providing them with the information they need to move forward.

Risk 52
article thumbnail

All You Need To Know About Construction Project Management To Get Started

Construction Marketing

Even infrastructure projects like roads and sewers. This process is called a design, bid, and build contract. Alternatively, the design, build contract style means that the same company will handle both the designing and construction of the building itself. Tall skyscrapers, tourist attractions, factories, homes.

article thumbnail

TYPES OF CONCRETE MIX DESIGN

The Constructor

IS 456-2000 has designated the concrete mixes into a number of grades as M10, M15, M20, M25, M30, M35 and M40. In this designation the letter M refers to the mix and the number to the specified 28 day cube strength of mix in N/mm2. For this reason, the minimum compressive strength has been included in many specifications.

Concrete 240
article thumbnail

ACCEPTANCE CRITERIA FOR DESIGN MIX CONCRETE

The Constructor

III Concrete which does not meet the strength requirements as specified in I, but has a strength greater than that required by II may, at the discretion of the designer, be accepted as being structurally adequate without further testing. times the standard deviation; and 2) 0.80 times the standard deviation; and 2) 0.80

Concrete 229