Remove Documentation Remove Insurance Remove Overhead Remove Travel
article thumbnail

Job Order Contract Execution Guide – Sample Template

Job Order Contracting

The following template is provide for sample purposes only and should not be used a legally bidding document without through review and modification by appropriate Owner legal counsel. coefficient (reference table of allowable overhead). Architect/Engineer’s Guidelines, Quality Control, and other related documents in effect at.

Contract 100
article thumbnail

New And Restarting Contractors

Contractor Bookkeeping

As their business grows they like to take time off and enjoy travel and vacations. Maybe you began your company with a few friends and relatives and thought your overhead expenses would be low since you worked out of your home. This Means You Have Overhead - Not just office overhead, you have field overhead too.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

A glossary of terms with reference to Construction Cost Estimating

Construction Cost Estimating

B Basis of estimate (BOE) - a document which describes the scope basis, pricing basis, methods, qualifications, assumptions, inclusions, and exclusions. Bill of quantities (BOQ) - a document used in tendering in the construction industry in which materials, parts, and labor (and their costs) are itemized.

article thumbnail

Job Order Contracting – Best Practices Implementation

Building Information Management

A job order (JO) or task order (TO) is the contractual document issued by the purchasing/procurement or its designated representative to the Contractor. Taxes, insurance, fringe benefits, and vacation allowances are to be included in the Contractor’s coefficient. Job Orders / Task Orders. Execution Procedures.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Application: This standard applies to warehouse or large overhead rolling doors. Door, Manual, Overhead. This standard applies to manually operated overhead doors. As of this writing, the most recent document was authored in 1997. As of this writing, the most recent document was authored in 1997. Application 1.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

Procurement and Contracting Requirements Group (Division 00): Introductory Information: Indexing and general information documents. 00 62 16 Certificate of Insurance Form. 00 73 16 Insurance Requirements. 00 62 16 Certificate of Insurance Form. 00 73 16 Insurance Requirements. 01 32 33 Photographic Documentation.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

Procurement and Contracting Requirements Group (Division 00): Introductory Information: Indexing and general information documents. 00 62 16 Certificate of Insurance Form. 00 73 16 Insurance Requirements. 00 62 16 Certificate of Insurance Form. 00 73 16 Insurance Requirements. 01 32 33 Photographic Documentation.