Remove Drafting Remove Fabrication Remove Inspections Remove Permits
article thumbnail

What is Building Construction | Steps & Processes of Building Construction | Application of Building Construction | How to do Planning of Building Construction

CivilJungle

Building Permits. Step 2: Draft a Preliminary Plan: Utilization of S.M.A.R.T. & How to Submit a Building Permit? Before beginning of a job, it’s required that you simply acquire a building permit. A distinct permit is required for every sort of work (like demolition, plumbing, electrical, mechanical work, etc.).

Plans 52
article thumbnail

Demystifying fire-retardant treated wood specifications

Construction Specifier

ft) flame under controlled conditions of draft and temperature onto the surface of a 7.4-m Warranties for FRTW are manufacturer-specific and must be submitted by the authorized company official indicating the FRTW is manufactured under independent third-party follow-up inspection and that it meets or exceeds the code requirements for FRTW.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

What are Simplified Acquisition of Base Engineer Requirements (SABER)

Building Information Management

The level of architectural/drafting support performed by the contractor (not to be interpreted to mean A-E services); 3.5.3.1.6. To permit subsequent use, the contracting officer must incorporate prices for NPIs by supplemental agreement into the SABER contract itself, in which case they become pre-priced items under the contract.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 31 43 Permit Application. 00 31 46 Permits. 01 21 19 Testing and Inspecting Allowances. 01 41 26 Permit Requirements. 01 43 19 Fabricator Qualifications. 01 43 26 Testing and Inspecting Agency Qualifications. 01 45 23 Testing and Inspecting Services. 01 45 26 Plant Inspection Procedures.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 31 43 Permit Application. 00 31 46 Permits. 01 21 19 Testing and Inspecting Allowances. 01 41 26 Permit Requirements. 01 43 19 Fabricator Qualifications. 01 43 26 Testing and Inspecting Agency Qualifications. 01 45 23 Testing and Inspecting Services. 01 45 26 Plant Inspection Procedures.

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

The business must obtain a direct-pay sales and use tax permit from the State of Arkansas. Program regulations are currently being drafted to include the expanded definition for “Advanced Manufacturers.” Expedited permitting; comprehensive plan amendments). ” For more information, please visit this link.

Income 108