Remove Drafting Remove Feasibility Remove Inspections Remove Reference
article thumbnail

What is Building Construction | Steps & Processes of Building Construction | Application of Building Construction | How to do Planning of Building Construction

CivilJungle

Manufacturing refers to production of comparable items with no particular purchaser, while construction occurs on a location for a known client. Step 2: Draft a Preliminary Plan: Utilization of S.M.A.R.T. & Draft an initial plan: Use the S.M.A.R.T. Definition of Construction. What is Building Construction? & C.L.E.A.R.

Plans 52
article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Inspect electrical power panel. Inspect control panel for loose connections. Inspect Bollard/Barricade coatings, decals and paint. Visually inspect for corrosion. Inspect general arrangement of door and mechanism, mountings, standards, wind locks, anchor bolts, counterbalances, weather stripping, door sweeps etc.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

Internal Revenue Code Credits Adopted by Reference (AS 43.20.021): Under Alaska’s blanket adoption of the IRC, taxpayers can claim all federal incentive credits. Program regulations are currently being drafted to include the expanded definition for “Advanced Manufacturers.” Unused credits may be carried forward.

Income 108
article thumbnail

Best Practices for Multiple Award IDIQ – Task and Delivery Order Contracting

Building Information Management

Under the Clinger-Cohen Act (formerly referred to in part as the Information Technology Management Reform Act), which became effective on August 8, 1996, an agency head may establish a multi-agency contract for IT in accordance with guidance issued by the Office of Management and Budget (OMB) (see 40 U.S.C. 1424(a)(2)).