article thumbnail

Auto Draft

FDR Safety

Finding safeguards for a specific task is challenging because a physical guard may not be feasible. OSHA AND FEASIBILITY The OSH Act is the relevant law, and OSHA standards are the relevant regulations for most employers and employees in the United States. A feasibility assessment usually takes less than an hour.

Drafting 156
article thumbnail

THE ESTIMATING PROCESS FROM A TO Z

Construction Cost Estimating

In some cases, soil testing by a civil, geotechnical, or soils engineer is better to assist formulate a feasible arrange. You will conjointly like granular fill (gravel or crushed stone) for improved voidance beneath and round the house or for curtain drains to regulate subterranean water.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Check throw regulator and spring assembly for tightness. Check operation of all relays, pilot valves, and pressure regulators. Verify correct main line pressure leaving the main line air regulator. If the pressure is not correct adjust or repair the regulator 3. Replace washers and/or “o” rings if required. Electrolyte.

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

To receive an abatement for property taxes, a project must meet certain qualifications and follow certain procedures, as determined by law and regulation. To receive abatement for any or all of these taxes, a project must meet certain qualifications and follow certain procedures, as determined by law and regulation.

Income 108
article thumbnail

Cover Story: New Energy Powers Growth

Buisness Facilities Contributed Content

SGICC will use the bulk of the D2PA funds to provide grants to PA-based small companies to demonstrate the feasibility of emerging technologies, or seed funds to test and help launch ideas, and to assist in market acceptance and growth of shale energy focused products or services. Already the nation’s No. 2 crude oil producer and No.

article thumbnail

Best Practices for Multiple Award IDIQ – Task and Delivery Order Contracting

Building Information Management

The interagency team was also instrumental in ensuring that the regulatory guidance in the Federal Acquisition Regulation (FAR) conformed to the FASA authority. Therefore, GSA regulations, and the guidance in FAR Subpart 8.4 The prospective offerors were scheduled in groups in four separate half-day sessions to review the draft RFP.