Remove Drafting Remove Inspections Remove Permits Remove Travel
article thumbnail

No Free Warranty: Connecticut Court Adopts Correction or Repair Test

Constructlaw

Travelers Cas. & Travelers Casualty & Surety Company of America (Travelers) issued the payment bond for the project. ALS’s subcontract permitted the DOT to hold back 60% of its payments to assure ALS would warranty the work, which ALS did with site checks performed between June 2019 and May 2020.

article thumbnail

Bird Friendly Building now the Law in Howard County

Green Building Law Update

The County Department of Inspections, Licenses and Permits statistics indicate it would apply to less than 1% of permits issued each year. SSpc55 credit , but zealots may have preferred the originally drafted version by the American Bird Conservancy?

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Demystifying fire-retardant treated wood specifications

Construction Specifier

ft) flame under controlled conditions of draft and temperature onto the surface of a 7.4-m Warranties for FRTW are manufacturer-specific and must be submitted by the authorized company official indicating the FRTW is manufactured under independent third-party follow-up inspection and that it meets or exceeds the code requirements for FRTW.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Inspect electrical power panel. Inspect control panel for loose connections. Inspect Bollard/Barricade coatings, decals and paint. Visually inspect for corrosion. Inspect general arrangement of door and mechanism, mountings, standards, wind locks, anchor bolts, counterbalances, weather stripping, door sweeps etc.

article thumbnail

Industry Focus: Logistics – Going With The Flow

Buisness Facilities Contributed Content

In Belen, BNSF operates the largest inspection yard on the southern transcontinental corridor, linking Southern California and Chicago, and serves as a regional maintenance and fueling facility for trains up to 10,000 feet long. In 2011, New Mexico created a six-mile overweight cargo zone around the Santa Teresa port-of-entry.

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

The business must obtain a direct-pay sales and use tax permit from the State of Arkansas. Program regulations are currently being drafted to include the expanded definition for “Advanced Manufacturers.” Expedited permitting; comprehensive plan amendments). ” For more information, please visit this link.

Income 108
article thumbnail

Best Practices for Multiple Award IDIQ – Task and Delivery Order Contracting

Building Information Management

Use good judgement to ensure that travel costs do not become excessive. The goal was to expedite the process of providing draft RFPs to industry and obtaining their feedback, a process which can take six months to a year to finalize. The NIH facilitators then obtained consensus for each section of the draft RFP.