Remove Drawings Remove Inspections Remove Overhead Remove Safety
article thumbnail

Door Closer Hinges: A New Approach

Construction Specifier

Innovative engineering has made closer hinges more compact and functional; the new generation of products provides unique combinations of features and benefits to address door closing challenges that are not satisfactorily met by overhead surface-mounted door closers. Performance. The closer hinges have built-in door stops. Aesthetics.

article thumbnail

First Home Checklist 2022

CivilJungle

Also, inspect the inside and outside of the home and know about every specific thing, like the presence of any tree near the structure because its roots cause a problem in the future for the structure. Doors and windows are a significant portion of the home for safety, ventilation entrance, and many purposes. Foundation of House.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Job Order Contract Execution Guide – Sample Template

Job Order Contracting

coefficient (reference table of allowable overhead). ORGANIZATION NAME Technical Staff / Facilities Management Department Representative(s) and authorized ORGANIZATION NAME Procurement Authority review the Contractor’s Proposal. The UPB costs should NOT include contractor overhead and profit. Safety Nets. authorization.

Contract 100
article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Preventative maintenance is critical to facilities occupant health and safety, as well as meeting an organization’s fiduciary responsibilities. Check Bollard/Barricade safeties (proximity, Photo, infra red, pressure etc) 7. Inspect electrical power panel. Inspect control panel for loose connections. Tool Group A.

article thumbnail

10 Essential Types of Construction Documents

Autodesk Construction Cloud

Architectural drawings. Safety reports. 5: Drawings. Construction documents often include architectural drawings. Overhead costs. Inspection fees. These documents essentially cover the full range of your business operations from the beginning of a project until the end. . Work orders. 6: Specifications.

article thumbnail

Tecovas Vs Lucchese Boots – Which is The Better Brand?

Work Gearz

They also solely sell online, which lowers their overhead expenses. The boots are inspected for safety reasons, each boot (left and right) has a permanent mark with the ASTM standard on the interior upper. The Tecovas, for instance, do not have steel, safety, or composite toes if your job requires them. businesses.

article thumbnail

List of Common Construction Abbreviations

Job Order Contracting

DWG: Drawing. DWGS: Drawings. INSP: Inspect. OH: Overhead. OHD: Overhead Door. SFGL: Safety Glass. SV: Safety Relief Valve. DRBD: Drainboard. DS: Downspout, Disconnect Switch, Door Switch. DSP: Dry Standpipe. DT: Drain Tile. DTL: Detail. DVTL: Dovetail. DW: Dumbwaiter, Distilled Water. DWL: Dowel.