Remove Drawings Remove Lien Remove Maine Remove Permits
article thumbnail

Understanding the Performance and Monitoring Phase of Construction

Levelset

During this phase, the architect builds on the rough ideas provided during the preconstruction phase to produce sketches, drawings, elevations, and other features. The architect and the project owner will work closely together to finalize the drawings. This breaks down into a few main areas: the job scope, the budget, and the schedule.

Lien 52
article thumbnail

The Preconstruction Phase: Understanding the Process & Risks

Levelset

They’re essentially the main point of contact for the client, providing them with the knowledge and experience to get the project rolling. . These drawings give the client something to picture and provide feedback on before moving to the next stage. Permit and inspections. What does a preconstruction manager do?

Risk 52
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Architect not liable when owner deviates from plans

Construction Lawyer

« Fifth Circuit holds that manifest disregard is not basis for reversal | Main. 2d 163 (August 23, 2011), an architect was hired to prepare drawings for permit. The drawings required the use of traditional wood joists and listed various finishes. ILLINOIS APPELLATE COURT DEEMS MECHANICS LIEN COUNTERCLAIM UNTIMELY.

Plans 51
article thumbnail

How a Construction-to-Permanent Loan Impacts Contractors & Lenders

Levelset

Here are the main benefits and downsides of construction-to-permanent loans and how they can streamline the financing procedure. Contractors need to pay close attention to detail in their project documentation and draw requests. Learn more: The construction loan draw process explained. Failing to protect lien rights.

article thumbnail

STATE INCENTIVES GUIDE

Buisness Facilities Contributed Content

The capital credit is used only after all other deductions, losses or credits permitted under Titles 40 and 41 of the Code of Alabama 1975. The business must obtain a direct-pay sales and use tax permit from the State of Arkansas. This credit cannot be carried forward or back, and cannot be used to generate a refund to the taxpayer.

Income 75
article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 01 15 List of Drawing Sheets. Measured Drawing Information. 00 31 43 Permit Application. 00 31 46 Permits. 00 01 15 List of Drawing Sheets. Measured Drawing Information. 00 31 43 Permit Application. 00 31 46 Permits. 00 01 15 List of Drawing Sheets. Measured Drawing Information.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 01 15 List of Drawing Sheets. Measured Drawing Information. 00 31 43 Permit Application. 00 31 46 Permits. 00 01 15 List of Drawing Sheets. Measured Drawing Information. 00 31 43 Permit Application. 00 31 46 Permits. 00 01 15 List of Drawing Sheets. Measured Drawing Information.