Remove Drawings Remove Maine Remove Security Remove Sewer
article thumbnail

How to plan your warehouse layout

The Korte Company

As we discuss the multitude of factors influencing the layout of a warehouse, we’ll share stories from past warehouse construction projects and actual drawings made during the early stages of projects to illustrate how discussions about these important assets turn into plans on paper. See the drawings here if you want to skip ahead.

Plans 75
article thumbnail

Less Is More In New England

Business Facilities

Safran Aerospace Composites, in a unique partnership with Albany, has built a 345,000-square-foot facility for composite jet engine components, and has secured an option on another 50 acres. The Main Street Approach targeted economic revitalization, events, Downtown design and organization outreach with their army of volunteers.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Security Bollards/Barricade. Application: This standard card applies to automatic hydraulic security Bollards/Barricades found at driveway entrances, and other areas where vehicular traffic must be controlled. Notify affected personnel before performing PM (alarmed or security entrances). Gates and Fences, Security and Access.

article thumbnail

Signs It’s Time to Replace Your Sump Pump | How Old Is Your Sump Pump | Is Your Sump Pump Running All the Time

CivilJungle

Proceed with sump basin space- switch the sump pump basin upended and place it on the lowest surface with the pencil, draw a straight line surrounding the sump pump basin, then separate the bay. Some homeowners assume that if their sump pump backs up, the damages will be covered under the “Sewer and Drain Back-ups” portion of their policy.

article thumbnail

List of Common Construction Abbreviations

Job Order Contracting

CISP: Cast Iron Soil/sewer Pipe. DWG: Drawing. DWGS: Drawings. FM: Fire Main, Factory Mutual Company. SEC: Second, Section, Secondary, Security System. SPM: Sprinkler Main. W: West, Width, Wide, Watt, Waste, Water, Water Main. CHS: Chilled Water Supply. CI: Cast Iron. CIN BL: Cinder Block.

article thumbnail

What Is Building | Types of Building

CivilJungle

The buildings in which people can live securely and also which have many parts like bedroom, dining room , bathroom, living room, storage room, and garage are called residential rooms. How to Draw a House Plan Step by Step. Semi-Detached Building. Multi-Story or High-Rise Buildings. Unsafe Buildings. Multi-Level Car Parking.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 01 15 List of Drawing Sheets. Measured Drawing Information. 00 43 13 Bid Security Form. 00 01 15 List of Drawing Sheets. Measured Drawing Information. 00 43 13 Bid Security Form. 00 01 15 List of Drawing Sheets. Measured Drawing Information. 00 43 13 Bid Security Form. Requirements.