Remove Engineering Remove Fabrication Remove Feasibility Remove Inspections
article thumbnail

2013 Interpretations of OSHA Regulations

Safety Services Company

1910.1200 Hazard Communication Standard (HCS) inspection guidance for Combustible Dust. Guidance for OSHA inspectors when inspecting manufacturers and importers to determine whether they are in compliance with the requirements for combustible dust – 1910.1200(d) – until OSHA addresses the issues in its rules. December 27, 2013.

OSHA 48
article thumbnail

What is Building Construction | Steps & Processes of Building Construction | Application of Building Construction | How to do Planning of Building Construction

CivilJungle

Development planning is crucial in managing & implementation of construction projects since it involves selecting the technology, recognizing feasible workflows & estimating specified resources. Whether the fabric is chosen correctly & the reasonable utilization can directly affect the standard of the project.

Plans 52
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

BIM, Value Management, Life-cycle Cost Management

Building Information Management

Department of Civil Engineering, Universiti Teknologi PETRONAS, Bandar Seri Iskandar 31750 Tronoh, Perak Darul Ridzuan. Various terms – value engineering, value control, value analysis and value engineering- have been used to describe the principle of value engineering. Abdul Lateef A, Olanrewaju.

article thumbnail

What are Simplified Acquisition of Base Engineer Requirements (SABER)

Building Information Management

Simplified Acquisition of Base Engineer Requirements (SABER) contracts provide a streamlined means to complete construction projects estimated at less than 750K. Contracting personnel and civil engineers are encouraged to adapt their SABER-like acquisitions and processes to meet their local needs and the local environment.

article thumbnail

PPE for Industrial Safety

Safety Services Company

Hand and arm: Durable work gloves, fabric/coated fabric protection gloves, chemical/liquid resistant gloves, and insulating rubber gloves. PPE is the last line of defense, and should only be used when engineering controls and administrative controls aren’t feasible. Hazard Control. Guidelines.

Safety 48
article thumbnail

Job Order Contracting – Best Practices Implementation

Building Information Management

The Technical team (Facilities Management / Engineering) develops specifications and plans necessary for the procurement and implementation of the JOC. Competitive quotations shall be secured wherever feasible, and in all instances, when requested by the Owner. The Owner reserves the right to inspect such off- site work at any.

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

architectural and engineering, interest incurred during construction, etc.). To qualify, the research must be conducted within California and include basic or applied research of scientific inquiry, original investigation for the advancement of scientific or engineering knowledge or improved function of a business component.

Income 108