article thumbnail

Reduce, Reuse, Recycle - Construction & Demolition Materials

Green Home Design Architect

If you are planning a construction or remodeling project , there are a number of things you can do before you start: 1. This document can assist users in determining the most feasible methods for reducing C&D debris being disposed of in landfills. Consult the Field Guide for Residential Remodelers. Source: www.epa.gov.

article thumbnail

All About Kitchen Cabinets | Types of Kitchen Cabinets | Types of Kitchen Cabinets Partial Overlay | Types of Kitchen Cabinets Materials | Types of Storage Cabinets

CivilJungle

It is also environment friendly and is available at a low cost. Spruce reports that the national average cost to remodel a 10-foot by 10-foot kitchen can be as high as $26,000. Building your own kitchen cabinets is only a feasible plan if you have plenty of time, a shop full of tools, and intermediate woodworking skills.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

Energy Innovations Small Grant (EISG) Program: Provides up to $95,000 for hardware projects and $50,000 for modeling projects to small businesses, non-profits, individuals and academic institutions to conduct research that establishes the feasibility of new, innovative energy concepts. 50,000 (max.) for projects creating at least 100 jobs.

Income 108
article thumbnail

STATE INCENTIVES GUIDE

Buisness Facilities Contributed Content

Hawaii-based companies that receive Phase I feasibility study SBIR awards can apply for funds from HTDC’s Hawaii SBIR Matching Grant program. Qualified capital investment can include such items as the purchase or lease of a facility or equipment, remodeling or build-out costs, fixtures, furniture and computers.

Income 75
article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Examine the list for any omissions due to renovation, remodel, program changes, and newly added equipment. Examine the list for points deemed as no longer required to be alarmable due to renovations, remodels, program changes, or deleted equipment. Increase valve inspection frequency if equipment installed in corrosive environment.