Remove Equipment Remove Estimating Remove Inspections Remove Procurement
article thumbnail

Better Manage Construction Costs Schedules and Quality

Job Order Contracting

The fundamental reason for poor outcomes is the failure to implement and properly manage robust and integrated LEAN planning, procurement, and project delivery processes. 10% are due to equipment and/or materials delays, most off which could have been foreseen.

Schedule 163
article thumbnail

INSPECTION OF A BRIDGE STRUCTURE - The Constructor

The Constructor

Hence, the bridge must be regularly inspected and maintained for the benefit of its users. There are three levels of inspection: 1. General inspection: Usual inspection of representative parts of a structure. General inspection: Usual inspection of representative parts of a structure.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Job Order Contracting Operations Manual

Job Order Contracting

facilities inspection programs generate requirements for sustainment, restoration, modernization work and minor new construction. The work management office also completes a desk estimate of the project cost to help determine the best method for executing the work request (in-house shops, competitively bid individual contracts or JOC).

Contract 100
article thumbnail

5 Current Construction Industry Challenges and How Technology Can Help

Fieldwire

There is no substitution for timely materials and equipment. Technology is assisting construction sites with materials and procurement through payment. Tracking Equipment and Material on and Off-Site. Drones have ramifications for progress reporting, employee safety, and building inspections, among other things.

article thumbnail

Construction Equipments

The Constructor

The duration of a construction project is very much reduced by the application of these equipments. BULLDOZER A bulldozer is a crawler (caterpillar tracked tractor), equipped with a substantial metal plate (known as a blade), used to push large quantities of soil, sand, rubble, etc., play an important role in construction technology.

Equipment 104
article thumbnail

JOB ORDER CONTRACTING Solutions

Job Order Contracting

Job Order Contracting, or a JOC Program is NOT simply a procurement method that public and/or other organizations use to complete renovation, repair, and minor new construction projects. Each line time should be include a description in plain English using common terms as well as labor, material, and equipment cost details as appropriate.

Contract 100
article thumbnail

Army Job Order Contracts FAIL to meet AFARS requirements MOST OF THE TIME

Job Order Contracting

This practice does not work for material, labor, equipment, nor does it account for local market productivity in any effective manner. Locally researched JOC Price Books are readily available to provide cost visibility, cost transparency, and therefore improve cost management. b) Statement of work. (1)

Contract 226