Remove Feasibility Remove Permits Remove Site Remove Zoning
article thumbnail

Cracking the code of affordable housing

BD+C

The Jersey City government issued bonds to purchase the Bayfront site so it could control how it was sold and developed, making sure it included elements such as affordable housing and open space. The developers there are dedicating 134 units of affordable housing among 600 apartments and town homes.

Housing 104
article thumbnail

FEATURE STORY: 2013 Economic Development Deal of the Year Awards

Buisness Facilities Contributed Content

Appleā€™s new manufacturing facility will rise on the site of the former First Solar plant in Mesa, AZ. “Arizona’s team moved quickly to put together an attractive package that put the Mesa site front and center as Apple considered locations for its renewed commitment to U.S. Photo: solarsystems-usa.net). manufacturing.”

Deals 107
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

THE ESTIMATING PROCESS FROM A TO Z

Construction Cost Estimating

On the opposite hand, you may need to interrupt down some classes or line-items more, like Permits and charges generally Conditions or Countertops in room & tub. Building Permit 3. Electrical, Plumbing, Mechanical Permits 4. Pavement Cut Permit Fee 10. Zoning Fee 14. Tree Conservation Permit 17.

article thumbnail

19 Different Types of Slabs in Construction | What Is a Slab

CivilJungle

Permits and Property Value. Building a monolithic dome may require special permits depending on the type of structure. Replacing a flat roof with a pitched roof on an existing structure is not always feasible. Not feasible for buildings with multiple levels or complex plans. Building and site amenities.

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

Industrial Revenue Bonds: May be used as long-term financing of up to 100% of a project for: Acquisition of land, buildings, site preparation and improvements; Construction of buildings; Acquisition and installation of furnishings, fixtures and equipment; Capitalizable soft costs (e.g.,

Income 108
article thumbnail

STATE INCENTIVES GUIDE

Buisness Facilities Contributed Content

The capital credit is used only after all other deductions, losses or credits permitted under Titles 40 and 41 of the Code of Alabama 1975. The law allows more than one project on the same site. The business must obtain a direct-pay sales and use tax permit from the State of Arkansas.

Income 75
article thumbnail

Construction Cost Estimating Blog: Related Costs of a built.

Construction Cost Estimating

The contingency expenses for a construction may be associated with design development alterations, schedule adjustments, general administration changes (such as wage rates), contradictory site conditions for those anticipated, Third party obligations required for the duration of construction, as for example new permits. Blog Archive.