Remove Information Remove Life Cycle Remove Renovating Remove Visualization
article thumbnail

Best Value Facilities Repair, Renovation Work Order Delivery

Job Order Contracting

News Flash – Best value facilities repair, renovation work order delivery is now available to any real property owner. Continuously improve the process by sharing information on an early and ongoing basis. All parties can visualize project and work order requirements at a granular level and drive efficient life-cycle management.

article thumbnail

BIM, Big Data, and Efficient Life-cycle Management of the Built Environment

Building Information Management

Efficient life-cycle management of the built environment comes down to analyzing large data sets— big data—from several knowledge domains. 3D visualization software products currently promoted as BIM (Building Information Modeling) are not solutions for this task. Collaboration. Accuracy. . Evidence-based Management.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Construction Sector Waste Due to Flawed Decision-Making

Job Order Contracting

Best value construction planning, procurement, and project delivery methods are readily available to virtually assure maximized environmental and economic returns on AEC, facilities management, and other physical infrastructure repair, renovation, or new construction projects.

article thumbnail

BIM in Chains – Sustainability and Life-cycle Management of the Built Environment Stalled?

Building Information Management

BIM (Building Information Modeling) is the life-cycle management of the built environment supported by digital technology. I am “mad as hell” at how 3D visualization vendors have marketed BIM. ” – Bob Lowe, Deputy Director of University College London’s Energy Institute.

article thumbnail

The TOP 10 Things ALL Facility Owners Need to Know – Life-cycle Management of the Built Environment –

Building Information Management

Many/most Owners do not have the knowledge, capability, or organizational buy-in to support life-cycle management of the built environment. Far too often focus is upon first-costs vs. life-cycle costs. Your budget is largely operations/repair/renovation/maintenance, not new construction.

article thumbnail

BIM for FM

Job Order Contracting

Distribution and sharing of information by the Facilities Management Team is crucial to achieving cost efficient and high performing facilities, however, 3-D BIM visualization and modeling software is generally very sophisticated, relatively expensive, and very complex.

BIM 100
article thumbnail

Integrated project delivery method

Job Order Contracting

An integrated project delivery method is arguably required in order to achieve desired quality, satisfaction, timing, and cost for over 90% of renovation, repair, or new construction projects executed. A C ommon D ata E nvironment (CDE) is a strategic tool for sharing cost information and managing a team.