Remove 2002 Remove Architecture Remove Management Remove Site
article thumbnail

Characteristics of Strategic Collaboration and Efficient Construction Project Delivery

Job Order Contracting

management. Journal of Management in Engineering, 10(6), 26-29. management in the UK construction industry. Management, 6(3), 159-168. International Journal of Project Management, 25(4), 386-393. Journal of Construction Engineering and Management, 133(3), 225-234. Management Institute. Akintoye, A.,

article thumbnail

Revit OpEd: YUZU Site Measuring

Revit OpEd

YUZU Site Measuring. For readers that are already familiar with the Point Known PKNail site measuring system it appears to be similar, at least in concept. I think attempting to evaluate this type of technology would benefit from a few videos that show it in use, the practical application of it on-site. Site Information.

Revit 74
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Revit OpEd: RTC Europe Site and Details are Live Now

Revit OpEd

RTC Europe Site and Details are Live Now. Book - Introducing Revit Architecture. Introducing Autodesk Revit Architecture 2012 Now Shipping. Site Information. Comments: Comments are moderated to manage spamming. Refer to Autodesks own web site and product pages for specific trademark and copyright information.

Revit 61
article thumbnail

Efficient Construction Project Delivery for Public Sector Facility Owners – Renovation, Repair, Sustainability

Building Information Management

Most larger real property owners manage their assets in an ‘ad hoc’ manner and have little true visibility into requirements, costs, or levels of productivity. It is critical that this UPB be developed using industry standards for cost engineering and data architecture. A typical JOC contract runs from 3-5 years.

article thumbnail

Efficient Construction Project Delivery for Public Sector Facility Owners – Renovation, Repair, Sustainability

Building Information Management

While annual capital cost are second only to personnel costs for most organizations, few entities public sector or private, manage the built environment using LEAN best management practices. It is critical that this UPB be developed using industry standards for cost engineering and data architecture. Job Order Contracting. (1)

article thumbnail

Revit OpEd: Cool Lego Assembly Line

Revit OpEd

Book - Introducing Revit Architecture. Introducing Autodesk Revit Architecture 2012 Now Shipping. Site Information. Comments: Comments are moderated to manage spamming. Any reference to Revit, Revit Architecture, Revit MEP or Revit Structure on this site is made acknowledging this ownership. OpEd Videos.

Revit 78
article thumbnail

Revit OpEd: Chameleon for Grasshopper and Revit

Revit OpEd

It offers a Curtain Grid Manager that controls both panels and grids now, offers a preview of the system as well as helping to distinguish between vertical and horizontal orientations. There is a Chameleon Forum on his Revit City site as well as Chameleon Group at Grasshopper3D.com. Heres a video from his site: Posted by.

Revit 63