Remove 2004 Remove Architecture Remove Design Remove Risk
article thumbnail

Lean methodology is ignored by the construction sector

Job Order Contracting

Furthermore, of this 5%, most of the applications have not leveraged, or even been designed to leverage the full valued of Lean. Design-Build Contracting Claims: Cumulative Supplement. Engineering, Construction and Architectural Management, 8 (4,), 292-303. Design and Construction: Building in Value. Bramble, B.

article thumbnail

Characteristics of Strategic Collaboration and Efficient Construction Project Delivery

Job Order Contracting

2004; Black et al., Engineering, Construction and Architectural Management, 19(4), 342-368. The benefits of strategic collaboration vs. traditional construction planning, procurement, and project delivery are well documented and partially listed below (Chan et al., 2000; Grajek et al., 2000; Gransberg et al., Journal of Management in.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Revit OpEd: Working at Risk

Revit OpEd

Working at Risk. If you really want to continue to work at risk youll need to open the Workset dialog and make the workset the element is assigned to editable , which makes you the Owner of the workset. If someone else does this too or still has a valid connection to the central file you are working "at risk". Working at Risk.

Revit 60
article thumbnail

Revit OpEd: Building Design Suite Installation Readme

Revit OpEd

Building Design Suite Installation Readme. If you are preparing for installing the 2013 Revit products via the Building Design Suites then you might want to start with the System Requirements PDF documents for each version. Book - Introducing Revit Architecture. Introducing Autodesk Revit Architecture 2012 Now Shipping.

Revit 53
article thumbnail

Civil Engineering Marvels- 5 Tallest Skyscrappers

The Constructor

The building, designed by C.Y. Taipei 101 received the Emporis Skyscraper Award in 2004. They were the world’s tallest buildings from 1998 to 2004 if measured from the level of the main entrance to the structural top, the original height reference used by the US-based Council on Tall Buildings and Urban Habitat from 1969.

article thumbnail

EARTHQUAKE MAGNITUDE AND ENERGEY RELEASED

The Constructor

times On 26 December 2004, an earthquake of magnitude 9.0 releases 1000 times more energy than the earthquake of magnitude of 6.2 and 32 times more than the magnitude of 7.2. releases 1000 times more energy than the earthquake of magnitude of 6.2 and 32 times more than the magnitude of 7.2. and 32 times more than the magnitude of 7.2.

Concrete 104
article thumbnail

U.S. Construction – Improving Efficiency & Competitiveness

Building Information Management

Segmented, linear, and non-integrated processes: planning, financing, design, engineering, procurement, construction, operations, and maintenance. Lack of shared Risk/Reward – shifting responsibilities, and shifting levels of financial risk, which in turn often leads to adversarial relationships, disputes, and claims.