Remove 2005 Remove CAD Remove Drawings Remove Modeling
article thumbnail

Critical Issues and BIM – NIBS buildingSMART alliance conference – January 7-11, 2013

Building Information Management

Building information modeling (BIM) is beginning to fundamentally change the building industry in a very positive way. Tom Gay manages worldwide CAD and GIS services, site plan documentation and engineering document management services for The Factory Mutual Insurance Company (FM Global). David Quigley , East Coast CAD/CAM. .

BIM 45
article thumbnail

Critical Issues and BIM – NIBS buildingSMART alliance conference – January 7-11, 2013

Building Information Management

Building information modeling (BIM) is beginning to fundamentally change the building industry in a very positive way. Tom Gay manages worldwide CAD and GIS services, site plan documentation and engineering document management services for The Factory Mutual Insurance Company (FM Global). David Quigley , East Coast CAD/CAM. .

BIM 40
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Revit OpEd: DWG Files and Funky Snapping

Revit OpEd

For example Ive tried to draw squares and cubes, even circles and spheres to test the extremes and predict the trigger of the error messages Ive written about before. This manifests itself in snap icons that appear to miss the element we are attempting to reference in the CAD file. Revit now understands your real world situation.

Revit 72
article thumbnail

Revit and AutoCAD

Revit OpEd

Revit Structure was introduced (2005) and the conversation began again with engineers. In my opinion the phrase Building Information Modeling (BIM) was born in part because Autodesk desperately needed to differentiate ADT/ACA from Revit, at least as BIM is defined and expressed by Autodesk. Revit was the new kid on the block.

AutoCAD 98
article thumbnail

Leading the Home Building Industry: Pro Builder's 2021 Forty Under 40

Pro Builder

The project proposes sustainable solutions for Detroit’s 48204 ZIP code • Led the initiative to transition from CAD to BIM construction documentation and introduced several technical innovations to streamline operations • Created a custom BIM content library with hundreds of host components and subcomponents.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

building operating manual, controls as-built drawings, commissioning reports, re-commissioning reports) 7. Check all external restrictors for proper size and to verify the restrictor is installed per controls drawings. Replace air filters at sensors, controllers, and thermostats as required. Verify the restrictor is not clogged.