Remove 2005 Remove Drawings Remove Fabrication Remove Software
article thumbnail

Why Projects Fail

Job Order Contracting

56% of trade contractors cite poor coordination and communication as negative impact on productivity 68% of trade contractors claim that poor schedule management is the top contributor to low productivity Only 22% of organizations use a PM software. VersionOne ) 77% of high-performing projects use project management software.

article thumbnail

Life of an Architect Podcast Ep. 122: Architecture and Artificial Intelligence

BD+C

In 2005, Kory Bieg founded OTA+, an architecture, design, and research office that specializes in the development and use of current, new, and emerging digital technologies for the design and fabrication of buildings, building components, and experimental installations.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

How Rajat Buildtech is Leading the Way with Digital Adoption and Benefits

Autodesk Construction Cloud

Ltd was founded in 2005 with the vision of creating landmarks and contributing to the urban infrastructure development in the newly formed state of Chhattisgarh. Project teams have traditionally designed using 2D drawings, leaving room for misinterpretation and error between collaborating teams. and in with the new.

article thumbnail

Critical Issues and BIM – NIBS buildingSMART alliance conference – January 7-11, 2013

Building Information Management

The buildingSMART alliance TM Conference will help you understand how BIM can better integrate the design, construction, fabrication and operation processes, and provide you with the latest metrics available to assess industry progress. 10:00 – 11:30 AM Construction – Fabrication Integration.

BIM 45
article thumbnail

Critical Issues and BIM – NIBS buildingSMART alliance conference – January 7-11, 2013

Building Information Management

The buildingSMART alliance TM Conference will help you understand how BIM can better integrate the design, construction, fabrication and operation processes, and provide you with the latest metrics available to assess industry progress. 10:00 – 11:30 AM Construction – Fabrication Integration.

BIM 40
article thumbnail

Open information exchange of Heating, Ventilating and Cooling systems (HVAC) – A Important Standard? – HVAC information exchange – HVACie

Building Information Management

Accompanying the technical documentation are instructions for creating the HVACie files using commercial design software. HVACie extends the existing Industry Foundation Class Coordination View including equipment and system information streamlining construction shop drawing and fabrication. 2012-03-01-CERL-CR-12-2-ModelView.

article thumbnail

Open information exchange of Heating, Ventilating and Cooling systems (HVAC) – A Important Standard? – HVAC information exchange – HVACie

Building Information Management

Accompanying the technical documentation are instructions for creating the HVACie files using commercial design software. HVACie extends the existing Industry Foundation Class Coordination View including equipment and system information streamlining construction shop drawing and fabrication. 2012-03-01-CERL-CR-12-2-ModelView.