Remove 2013 Remove Consulting Remove Drawings Remove Software
article thumbnail

FEATURE STORY: 2013 Economic Development Deal of the Year Awards

Buisness Facilities Contributed Content

billion project that has earned our 2013 Economic Development Deal of the Year Gold Award. The GPEC chief added that he expects the Apple development in Mesa to draw other high-tech enterprises to the region. Direct economic impact of $1.33 billion over the next 10 years. 315 million in new wages directly created over 10 years.

Deals 107
article thumbnail

Critical Issues and BIM – NIBS buildingSMART alliance conference – January 7-11, 2013

Building Information Management

Day(s)/Date(s): January 7-11, 2013. Monday, January 7, 2013. Led document management and retention projects which resulted in selection, implementation and ongoing support of Documentum as the corporate repository for and distribution of engineering reports and drawings. Tuesday, January 8, 2013. Chris Moor.

BIM 45
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Virtual Construction Monitoring with NavVis

Construction Cost Estimating

So to fulfill all these demands using a tool is important which will be a big discovery in the construction industry in recent times which can provide lots of advantages to all the parties in the project such as project owners, investors, consultants, contractors, vendors or end users.

article thumbnail

Critical Issues and BIM – NIBS buildingSMART alliance conference – January 7-11, 2013

Building Information Management

Day(s)/Date(s): January 7-11, 2013. Monday, January 7, 2013. Led document management and retention projects which resulted in selection, implementation and ongoing support of Documentum as the corporate repository for and distribution of engineering reports and drawings. Tuesday, January 8, 2013. Chris Moor.

BIM 40
article thumbnail

Revit OpEd: Family Types Dialog - Lock Parameter

Revit OpEd

To lock a dimension directly in the drawing area, click next to the dimension.". This means that as the dimensions are moved in the drawing area, the associated parameters are constrained and the dimension value is preserved.". Note: Locked dimensions and their associated parameters cannot be changed in the drawing area.

Revit 66
article thumbnail

Revit OpEd: YUZU Site Measuring

Revit OpEd

The software boils down to these concepts: Defining Levels and Lease holders and then using 5 different tools to deal with measurements: Distance, Ortho, Offset, Rectangle and Triangle. They claim that with these features you will be able to create any drawing, shape and size of buildings. Content and Software Developers.

Revit 74
article thumbnail

Revit OpEd: Five Minutes with a Toposurface

Revit OpEd

This is what the triangulation looks like before adding an extra point to help Revit draw the contour more accurately. Yes, any method is an approximation; what I meant to say is that the method that creates the most faithful reproduction of the original 3d drawing from CAD is the.csv method. Content and Software Developers.

Revit 53