Remove 2018 Remove Certification Remove Infrastructure Remove Transportation
article thumbnail

Sustainability guidelines for ready mix plant certification

GCP Applied Technologies

Sustainability guidelines for ready mix plant certification. Fri, 11/02/2018 - 19:24. November 02, 2018. Transportation Infrastructure. Sustainability guidelines for ready mix plant certification. michael.delros…. GCP Applied Technologies. Plants are graded on a 100-point scale: Bronze: 30-49 points.

article thumbnail

The growing demand for transparency in buildings

Construction Specifier

This includes building controls, lighting, electrical and digital infrastructure, audio/visual (A/V), and other aspects of the structure. The demand for high-performance building controls, lighting, electrical, and digital infrastructure is rising. Environmental and material health impact of building materials.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

More Than Green Buildings, Green Roads

Green Building Law Update

are related to transportation (e.g., But when modern American society thinks about green building, those thoughts are almost universally of buildings and not of infrastructure like roads and bridges. The points translate to one of four certification levels: Bronze, Silver, Gold and Evergreen. and internationally.

Roads 296
article thumbnail

Top 10 PVC Pipe Manufacturers in India

CivilJungle

The company’s objective is to meet the growing needs of its clientele in water, waste management, and infrastructure sector through a specially developed high-performance range of piping products. FY 2018-2019). FY 2018-2019). Supreme’s wide range of piping products caters to almost every application segment. Revenue: 2958 Cr.

Income 52
article thumbnail

COVER STORY: Shovel Ready Sites Are Growing From The Ground Up

Buisness Facilities Contributed Content

are implementing site certification programs called “shovel ready”—meaning that the site is primed and ready for economic development. Additional construction will continue into 2016 and the plant is anticipated to begin commercial production in 2018. From the September/October 2013 issue . To get ready, many states across the U.S.

Site 49
article thumbnail

Workforce Training: Engineering A Skilled Workforce

Buisness Facilities Contributed Content

In March 2016, McAuliffe signed into law measures that establish a workforce training program targeted to increase specific industry certifications and occupational licenses that meet the needs of businesses in each region of the state. million for a veterans’ portal to strengthen outreach to this key population.

article thumbnail

Shovel-Ready Sites: Ready To Hit The Ground Running

Business Facilities

are implementing site certification programs that give available sites a shovel ready designation—meaning that the site is primed and ready for economic development. To achieve certification, sites go through a rigorous review process. States across the U.S. The outcome?

Site 87