Remove Accounting Remove Insurance Remove Overhead Remove Presentations
article thumbnail

7 Ways to Improve Construction Site Safety

Levelset

In 2019, the construction industry accounted for about 20% of all work-related fatalities in the U.S. Caught-in or between : Injuries or fatalities could occur when loose clothing gets caught in belts or pulleys while heavy equipment and foundation walls present two immovable objects that can crush or suffocate an employee.

Safety 52
article thumbnail

Top 8 Construction Health and Safety Hazards — and Ways to Protect Your Jobsite

Levelset

According to data from the Bureau of Labor Statistics, falls accounted for more than 1 in 3 jobsite fatalities in 2019. Falls trigger a lot of OSHA safety inspections, and they account for half of the top 10 violations handed out by the Office. “Struck-by” fatalities numbered 170 in 2019 , accounting for 15.4%

Safety 52
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Job Order Contract Execution Guide – Sample Template

Job Order Contracting

The Contractor must take these costs into account when proposing the. coefficient (reference table of allowable overhead). The UPB costs should NOT include contractor overhead and profit. The contractor typically bears overhead costs as part of the proposed coefficient of the JOC program. Insurance, fringe.

Contract 100
article thumbnail

Construction Business Owner Blogs

Construction Business Owner

ACCOUNTING |. INSURANCE |. Accounting & Finance. This seems to present a “darned-if-you-do-darned-if-you-don’t” situation. Change orders can be harder to manage – and present more of a profitability challenge – than pre-planned project work. Tags accounting. accounting software.

article thumbnail

Setting up a Job Order Contract Using Best Management Practices

Job Order Contracting

general and administrative and other overhead costs, insurance costs, bonding and alternative payment protection costs, protective clothing, equipment rental, sales tax and compliance with tax laws, and also contractor’s profit). g) Forms, numbering and reports. (1) Purchasing must maintain the permanent record of each transaction.

Contract 100
article thumbnail

How to Start a Roofing Business: 9 Tips to Grow & Thrive

Levelset

Lay the sheathing: Registration, licensing, and insurance. Get the proper license and insurance according to your state’s requirements. Obtain a business bank account and any software or staff you’ll need for accounting and bookkeeping. It’s important to keep your business’ finances separate from your personal accounts.

article thumbnail

8 Main Types of Construction Contracts

Autodesk Construction Cloud

They also include overhead costs such as insurance, mileage, a portion of your office rent. First, you’ll need to keep track of all of your expenses and be prepared to present them. The GMP includes costs for labor, materials, overhead, and a percentage of those costs to generate a profit. That’s the “plus.” .