article thumbnail

CAD Shack: AEI-Ashrae Expo - Call for Speakers

CAD Shack

Autodesk Fabrication 2013 at Autodesk University 2013. November 10 – Due date for speakers applications; Applications after this date will be accepted but there will be no guarantee that the speaker will be considered if all track sessions are filled. For more information go to [link]. Todd Shackelford. at 8:28 AM. Email This BlogThis!

CAD 40
article thumbnail

Job Order Contract Execution Guide – Sample Template

Job Order Contracting

Architect/Engineer’s Guidelines, Quality Control, and other related documents in effect at. The JO is issued and approved upon agreement between the ORGANIZATION NAME Representative and the Contractor on the scope of work, performance time, and the price for that work. equipment, and fabricating items customary to the trade, etc.,

Contract 100
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

2013 Interpretations of OSHA Regulations

Safety Services Company

Possible systems include a fabricated wood rail, and a c-clamp guardrail system. Can OSHA make a guideline provided by trench shield manufacturers to have no more than a 12 in. high concrete barrier doesn’t comply with minimum top edge requirement of a guardrail system to be 42 in. plus or minus 3 in.) June 4, 2013. March 11, 2013.

OSHA 48
article thumbnail

BIM Glossary Terms and Definitions – NBIMS-US – 2013

Building Information Management

The closeness of agreement within individual. Project Team Contract Agreements. link] for general Project Team roles and conditions; also see BIM SCORE for risk management guidelines – https://www.bimscore.com/. Level of Precision. Life-cycle Assessment. Reference Information. Reference Information sections.

BIM 40
article thumbnail

Job Order Contracting – Best Practices Implementation

Building Information Management

Job Order Contracting GUIDELINES & PROCEDURES. JOC, an annual contract and multiple option year agreement for general construction, generally requires the Contractor to e furnish associated labor, tools, materials, equipment and transportation. . JOB ORDER CONTRACTING. Unit Price Books.

article thumbnail

Open information exchange of Heating, Ventilating and Cooling systems (HVAC) – A Important Standard? – HVAC information exchange – HVACie

Building Information Management

HVACie extends the existing Industry Foundation Class Coordination View including equipment and system information streamlining construction shop drawing and fabrication. The detailed model provides fabrication and erection details required to physically construct and connect the sys-tem. See also ASHRAE Guideline 0 (ASHRAE, 2005).

article thumbnail

Open information exchange of Heating, Ventilating and Cooling systems (HVAC) – A Important Standard? – HVAC information exchange – HVACie

Building Information Management

HVACie extends the existing Industry Foundation Class Coordination View including equipment and system information streamlining construction shop drawing and fabrication. The detailed model provides fabrication and erection details required to physically construct and connect the sys-tem. See also ASHRAE Guideline 0 (ASHRAE, 2005).